Primary legislation relating to Health & Safety in the construction industry?
Health & Safety at Work Act 1974
CDM Regulations 2015
Name of RICS publication that relates to the health and safety of its members?
RICS Guidance Note Surveying Safely 2018
Occupational Health?
Physical and Mental effects of work on health, such as:
- Stress
- Violence and Bullying
- noise-induced hearing damage
RICS Surveying Safely, what is included?
- Personal responsibilities for RICS members and firms
- Assessing hazards and risks
- Occupational Health & Hygiene
- Fire Safety
What is notifiable project under CDM Regulations 2015?
Project that is expected to last longer than 30 working days and have more than 20 workers working at the same time at any one point or exceed 500 person days
What is the role of the Principal Designer under CDM Regulations 2015?
Plan, manage and monitor H&S in the pre-construction phase
Identify, eliminate or control future risks
Ensure Client & Designers carry out their duties
What is meant by the acronym RIDDOR?
Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
It requires the responsible person to report any death, injury or dangerous occurrence the the HSE
What other primary legislation is used to regulate safety in construction?
PPE Regulations 2022
Working at Height Regulations 2005
What obligations does PPE Regulations place upon you as an individual?
All workers must use the PPE properly following training and instruction in its use from their employer
What’s included in a site induction?
Outline of the project
First aid arrangements
Accident and incident reporting arrangements
Project Risk
How does Lone Working operate?
Workers who work by themselves unsupervised
What is meant by risk assessment?
Identifying a hazard, measuring the risk and identifying the method of reducing the risk
What is LOLER?
Lifting Operations Lifting Equipment Regulations
Who are the parties under CDM?
Client
Principal Designer
Principal Contractor
Designers
Contractors
Workers
What are the key points under CDM?
Improves H&S on site, through desing, planning and management
Places statutory duties on clients, principal designer, designers and contractors to plan, manage and coordinate H&S throughout the project
What are CDM Regulations?
Construction, Design & Management Regulations which apply to all buildings and construction works, with the aim of improving H&S
Duties of Client under CDM?
Appoint competent duty holders
Allow sufficient time and resources are allocated
Ensure principal designer and contractor carry out their duties
Employers requirements under the Health and Safety Work Act?
Legislation that ensures all employers provide a safe working environment for all their employees. This includes:
- Safe place of work
- Safe equipment
- Properly trained staff
- Provide proper facilities
- Appoint competent supervisors
What is my companies H&S Policy?
Inline with the H&S at Work Act:P
- Safe place of work
- Safe equipment
- Properly trained staff
- Provide proper facilities
- Appoint competent supervisors
What does COSHH stand for? What’s it’s aim?
Control of Substances Hazardous to Health
Aims to control avoid exposure to hazardous substances
What is an F10?
Form sent to HSE notifying them of a relevant construction project. Client’s responsibility
What does EUSR stand for?
What does SHEA stand for?
How did they benefit you?
Energy & Utility Skills Register
Safety, Health & Environmental Awareness
Provided me with H&S knowledge and understanding on my responsibilities in protecting public health and confidence in drinking water
What measures would you put in place if you are the only person on a site to protect your own safety?
Ensure someone was aware I was on site alone
Review temporary works and high risk areas
Wear correct PPE at all times
Not undertake high risk activities
Keep a mobile phone with myself at all times
Are you involved in reviewing and assessing sub-contractor’s H&S proposals in their tenders?
Yes, we consider the following when receiving tender submissions:
- Any notifiable RIDDOR’s in past projects
- Internal database that scores Subcontractors on H&S
Do you undertake specific H&S audits/reviews on your project?
I have accompanied the H&S Managers when they have completed audits/reviews, to understand the process and what they deem right
Following the Grenfell Disaster are you aware of any guidance the RICS has published to support fire safety?
‘Cladding for Surveyors 1st Edition
March 2021’ which support surveyors working on Multi-storey and multi occupancy residential buildings