FMF 102 Safety Fundamentals Flashcards
Discuss the term RM
A decision making tool used by people at all levels to increase our ability to make informed decisions and minimize risks to acceptable levels.
RM enhances readiness by:
-Enhancing tasks or mission accomplishment.
-Minimizing risk to acceptable levels.
-Enhancing decision-making skills on a systemic, reasoned, and repeatable process.
-Providing a systemic structure to perform risk assessments.
-Providing improved confidence for individuals to make informs risk decisions.
-Preserving personnel and material by avoiding unnecessary risk.
-Providing an adaptive process for the continuous feedback through planning, prep, and execution phases of any evolution.
-Identifying feasible and effective control measures, particularly where specific standards do not exist.
RM does not…
-Inhibit flexibility, initiative, or accountability.
-Remove risk altogether.
-Remove the need for practice, drill, rehearsals, tactics, techniques, and procedures.
-Sanctions or justify violating orders or the law.
Four principles of RM
Accept risk when benefits outweigh the cost.
Accept no unnecessary risk.
Anticipate and manage risk by planning.
Make risk decisions at the right level.
3 Levels of RM
In-depth: time for planning is not an issue
Deliberate: Ample time to apply the RM process.
Time Critical: Little or no time to make a plan
5 step process of RM
- Identifying hazards
- Assessing hazards
- Making risk decisions
- Implementing controls
- Supervising
PPE: Head
P.I.E.: Penetration, Impact, Electric shock
Hearing PPE
Noise levels greater than 84 dBA (8 hour TWA) sound level, 140 dB peak.
Double protection when noise level exceeds 104 dBA (8 hour TWA).
Hazardous Material
Any material that, because of its quantity, concentration, or physical or chemical characteristics, may pose a substantial hazard to human health or the enviornment when incorrectly used, purposefully released, or accidentally spilled.
Hazardous Waste
Any discarded material (Liquid, solid, gas) which meets the definition of HM and or is designated as a hazardous waste by the EPA or State authority.
MSDSs’
Technical bulletins containing information about materials.