What steps occur in the pre-design phase?
Needs Analysis
Feasibility study
Master plan
Hire architect
What is a SWOT analysis and when should it be performed
SWOT = Strengths, weaknesses, opportunities, and threats
Should be performed as part of the feasibility study during the pre-design phase
What steps occur in the design phase?
Finalize the design committee, create blueprint for facility
What steps occur in the construction phase?
Follow master plan to build facility, arrange equipment, check construction progress regularly
What steps occur in the pre-operation phase?
Hire staff, create cleaning schedule, assign duties, create plan for operation
What is the recommended minimum amount of space per athlete in a strength & conditioning facility?
100 SQ ft
What is the recommended minimum height for the ceiling of the strength & conditioning facility?
12-14 ft
What is the recommended temperature and humidity of the strength & conditioning facility?
68-78 degrees F, humidity should not exceed 60%
How far off the floor should mirrors be placed on the wall?
20 inches
How far away from equipment should mirrors be placed?
at least 6 inches
How wide should walkways between equipment be?
At least 36 inches
How much space should be between squat racks to allow room for spotters?
36 inches
What is the recommended minimum amount of space per athlete in the stretching/warm up area?
49 SQ ft