Besides the breaker position, the ‘RED’ indicating light on a 4160 Class breaker (cubicle door) also indicates?
A. Closing Spring is charged.
B. Protective relays are functioning.
C. Anti-pump circuitry has continuity.
D. Trip coil has continuity.
D. Trip Coil has continuity
A LOCA has resulted in a reactor trip and SIAS/CIAS initiation.
A ‘Brighter than normal green’ indication for the ‘A’ HPSI pump.
The switch is taken to the TRIP position and is released. What happens to the pump?
A. Nothing will happen.
B. The pump will enter an anti-pump condition.
C. The lockout relay will reset and the breaker will close and trip again if the initial fault is NOT cleared.
D. The lockout relay will reset and the breaker will close with its protection circuits bypassed.
C. The lockout relay will reset and the breaker will close and trip again if the initial fault is NOT cleared.
In order to close the Alt. Feed breaker to PBA-S03 locally (using the local Control Switch), which of following interlocks MUST be satisfied?
A. Synch Check relay satisfied ONLY.
B. Both the DG and normal supply breakers to this bus are open ONLY.
C. Synch Switch on B01 for this breaker is ON.
D. Synch Check relay satisfied AND both the DG and normal supply breakers to this bus are open.
B. Both the DG and normal supply breaker to this bus are open ONLY.
(Since the process is Break Before Make - ‘sync’ does not matter)
With a unit in MODE 1, which of the following describes the required AC Electrical sources which satisfies the LCO of Tech Spec 3.8.1, AC Sources - Operating?
A. One offsite circuit and one diesel generator each capable of supplying the onsite Class 1E Electrical Power Distribution System and both automatic load sequencers.
B. One offsite circuit and one diesel generator each capable of supplying the onsite Class 1E Electrical Power Distribution System and one automatic load sequencer.
C. Two offsite circuits and two diesel generators each capable of supplying the onsite Class 1E Electrical Power Distribution System and one automatic load sequencer.
D. Two offsite circuits and two diesel generators each capable of supplying onsite Class 1E Electrical Power Distribution System and both automatic load sequencers.
D. Two offsite circuits and two diesel generators each capable of supplying onsite Class 1E Electrical Power Distribution System and both automatic load sequencers.
Unit is operating at rated power. One Diesel Generator becomes inoperable.
What Tech Spec actions must be completed within one hour?
A. Verify correct breaker alignment and indicated power availability for two offsite power sources.
B. Restore DG to operable status.
C. Determine that DG ‘B’ is not inoperable due to a common cause failure.
D. Declare required feature(s) supported by DG inoperable when its redundant required feature(s) is inoperable.
A. Verify correct breaker alignment and indicated power availability for two offsite power sources.
Unit is operating at rated power.
NBN-X03 ESF Service Transformer detects a rapid pressure increase inside the Transformer’s casing.
Which breaker will NOT trip if currently closed?
A. PBA-S03 normal supply breaker.
B. PBB-S04 alternate supply breaker.
C. PBA-S03 alternate supply breaker.
D. NBN-X03 supply breaker.
C. PBA-S03 alt. supply breaker (PBA-S03 is disconnected from NBN-X03 in this situation)
Four (4) potential transformers supply a voltage signal to eight (8) under voltage relays.
These relays are responsible for detecting a degraded voltage of ____ or an under voltage condition of ____.
A. <80% for >30 seconds, <90% instantaneously.
B. <90% for <30 seconds, <75% instantaneously.
C. <90% for >10seconds, <75% instantaneously.
D. <90% for >30 seconds, <75% instantaneously.
D. <90% for >30 seconds, <75% instantaneously.
Which of the following supplies control power to ‘A’ 480 VAC Motor Control Center breakers?
A. PKA-D41
B. PKC-M43
C. PKA-M41
D. Self supplied, downstream of the circuit breaker.
D. Self supplied, downstream of the circuit breaker.
(Possible distractors is that they list PK buses)
Unit 3 is at 100% power.
Unit 3 Trip occurs. Fast bus transfer fails.
What is the status of NNN-D16?
A. De-energized
B. Energized from PHB-M38
C. Energized from NHN-M19
D. Energized from NHN-M10
B. Energized from PHB-M38
Unit is at 100%.
A fault occurs on PKC-M43.
With no operator action what is the status of 120 VAC Class Distribution Panel PNC-D27?
A. Energized from the back-up inverter PNC-N13
B. De-energized
C. Energized from voltage regulator PNC-V27
D. Energized from PHA-M35
C. Energized from voltage regulator PNC-V27.
Unit is operating at rated power.
A loss of PKB-M42 occurs.
How can RCS Pressure be controlled?
A. Aux spray ‘A’ or ‘B’ Only
B. Main Spray Valves ONLY
C. Aux Spray ‘A’ ONLY
D. Aux Spray ‘A’ or the Main Spray Valves.
D. Aux Spray ‘A’ or the Main Spray Valves.
The unit is operating at rated power.
A loss of PNC-D27 occurs. What impact (if any) will this loss have on BOP ESFAS?
A. Train ‘A’ CPIAS, CREFAS and FBEVAS actuations only.
B. Train ‘A’ and ‘B’ CPIAS, CREFAS, and FBEVAS will actuate.
C. Train ‘A’ BOP ESFAS will become de-energized and not function.
D. Nothing will actuate or become non-functional due to the power loss.
D. Nothing will actuate or become non-functional due to the power loss.
Unit is operating in Mode 1.
The fuses for a bus potential transformer (PT) located in on PBA-S03 blow.
The PT supplies undervoltage relays 727-1 and 727-5.
A. PBA-S03 will load shed, the D/G will start and close in on the bus.
B. PBA-S03 will load shed, the D/G will need to be manually started to re-energize the bus.
C. The D/G will start and run unloaded while PBA-S03 remains energized from offsite power.
D. No Actuation should occur.
D. No Actuation should occur.
(Note: The BOP ESFAS system will only decide that an undervoltage condition exists if 2 out of the 4 inputs sense the condition. This coincidence logic prevents a signal failure (PT failure, for example) from activating ESF equipment.)
(Note: 1 PT supplies 1 Degraded and 1 Undervoltage Relay.)
The ‘B’ Diesel Generator is Out of Service and tagged out.
You have been directed to transfer PBB-S04 from its normal to its alternate power source at the switchgear to support outage power configuration.
Which of the following describes the correct sequence to perform this operation?
A. Trip the normal feeder breaker using the local switch at PBB-S04. After the breaker is open, close the alternate feeder breaker at PBB-S04 completing the transfer.
B. After verifying that off-site power is supplying both the normal and alternate power supplies, close the alternate breaker using the local control switch at PBB-S04. After the breaker is closed, open the normal feed breaker at PBB-S04 completing the transfer.
C. Have the control room verify that the power supplies are in-phase. When this is done, close the alternate using the local switch at PBA-S04. After the breaker is closed, open the normal feed breaker at PBB-S04 completing the transfer.
D. After verifying that the power supplies are in-phase using the local synchronized check indication, close the alternate breaker using the local control switch at PBA-S04 completing the transfer.
A. Trip the normal feeder breaker using the local switch at PBB-S04. After the breaker is open, close the alternate feeder breaker at PBB-S04 completing the transfer.
Loss of offsite power. Both diesel generators are running with normal voltage and frequency.
Normal and alternate power supply breakers for PBB-S04 are open. PBB-S04 is de-energized.
A possible reason that PBB-S04 is de-energized would be that…
A. A fast bus transfer relay failed to actuate.
B. A DG reverse power alarm/trip has actuated.
C. A Bus Fault has caused an 86 lockout on the normal supply breaker.
D. A synch check relay could not be satisfied because the bus was de-energized.
C. A Bus Fault has caused an 86 lockout on the normal supply breaker.
How do you get an Override light to come on?
Taking the components hand switch to its actuated position.