CS (Containment Spray) Flashcards
1
Q
The Containment Spray System is designed such that the peak Containment pressure following a design basis event be reduced by at least?
AND
In what time frame?
A
50%, 24 hours
2
Q
During normal operations the RAS Sump suction piping is expected to be in what condition?
A. Full of water.
B. Empty.
C. Half full of water.
D. One third full of water.
A
A. Full of water.