VCT Volume (e.g. % per gal)
41.26 gal/%
VCT level is 45%
RWT to charging pump suction valve (CHN-UV-536) is open
VCT outlet valve (CHN-UV-501) is closed
Which of the following describes the interlock between CHN-UV-536 and CHN-UV-501?
A. UV-501 will automatically open following a manual closure of UV-536.
B. UV-536 auto opens on a loss of power to UV-501.
C. UV-536 will auto open whenever UV-501 is closed.
D. UV-536 will auto open whenever UV-501 is opened.
A. UV-501 will automatically open following a manual closure of UV-536.
Which one of the following describes the sequence of events when a low level of 5% occurs in the volume control tank?
A. Letdown is automatically diverted from the volume control tank to the pre-holdup ion exchanger.
B. Charging pump suction will come from a boric acid makeup pump that will automatically start.
C. Charging pump suction will come from a reactor makeup water pump that will automatically start.
D. Holdup pumps will secure if the holdup pump to the reactor drain filter valve (CHN-V686) is open.
B. Charging pump suction will come from the boric acid makeup pump that will automatically start.
Which one of the following will cause an auto open of the RWT to Charging Pump Suction Valve CHE-UV-536?
A. A low-low (5%) VCT level Only.
B. A loss of power to UV-514 Only.
C. A low-low (5%) VCT level and a loss of power to UV-514.
D. UV-501 is taken to close position with UV-514 closed.
C. Low-Low (5%) VCT level and loss of power to UV-514.
Unit is at rated power.
Seal Injection is isolated to the RCPs due to a leak in the Aux Building.
Which of the following describes the effect (if any), that this has on the RCP Temps?
A. Isolating Seal Injection should have NO impact on the seal temperatures.
B. HP Seal Cooler inlet temperature will rise to between 200F and 220F, all other seal temperatures should increase by about 70F.
C. HP Seal Cooler inlet temperature should remain relatively constant, while all other seal temperatures should increase by about 70F.
D. HP Seal Cooler inlet temperature will rise to between 200F and 220F while all other seal temperatures remain normal.
D. HP Seal Coil inlet temperature will rise to between 200F and 220F while all other seal temperatures remain normal.
Unit is at 100% power.
NC surge tank level is rising.
RU-6 process monitor is in alarm.
What would be indicative of a RCS leak in the letdown heat exchanger?
A. Back pressure control valve closing.
B. Back pressure control valve opening.
C. Indicated letdown flow increasing.
D. NC flow from the heat exchanger decreases.
A. Back pressure control valve closing.
Unit is operating at 100% power.
The chemical and volume control system is in its normal lineup.
Which one of the following would occur if letdown heat exchanger outlet temperature exceeds 135F?
A. Seal injection flow would decrease.
B. Letdown flow would isolate.
C. Volume control tank level would increase.
D. Charging flow would increase for additional cooling.
B. Letdown flow would isolate.
Plant conditions require IMMEDIATE boration.
RCS pressure is 2230 psia.
RWT level is 65%.
Which ONE of the following methods is available for immediate boration?
Align Charging pump…
A. Suction to the RWT through CHE-UV-536.
B. Suction to the RWT through CHN-UV-514, ensuring a BAMP pump is operating.
C. Suction to the RWT through CHN-UV-514, ensuring the Boric Acid Makeup filter is bypassed.
D. Alternate suction through CHB-V327.
D. Alternate suction through CHB-V327.
Valve is in East Mech Pen. Down the ladder
Plant conditions are such that shutdown margin is less than required. Regarding the use of gravity feed from the Safety Injection System through CH-V327 to the charging pumps, which one of the statements is correct?
A. When the RWT Lvl reaches 40%, a CHG pump low suct trip will occur.
B. The RWT Lvl must be above 73% if this flow path is used to ensure CHG pump suction.
C. Manual valve operations must be performed outside the control room.
D. In order to satisfy TS req., the boration flow rate must be 50 gpm.
C. Manual valve operations must be performed outside the control room.
An emergency boration is required and the path through CHN-UV-514 has been chosen. If the BAMPs are not available, which additional valve must be opened to ensure adequate NPSH exists for the charging pumps?
A. CHN-V164
B. CHN-V144
C. CHN-UV536
D. CHN-UV514
A. CHN-V164
Location is 120’ behind block wall
When using the Spent Fuel Pool (SFP) as a source for emergency boration, why must CHN-HV-532 be closed?
A. The SFP boron concentration is higher than RWT.
B. PC Clean-up must be isolated if the valve is left open.
C. A gravity flow path would be established between the SFP and RWT.
D. Three charging pumps cannot run on the SFP with the valve open.
C. A gravity flow path would be established between the SFP and RWT.
CHN-UV-510 will close when CHN-FIC-210Y indicates flow of….
A. 3 GPM
B. 2 GPM
C. 20 GPM
D. 10 GPM
C. 20 gpm.
CHN-UV-510 (re-circ for BAMPs to RWT).
Unit is at 100% power.
Dilution to the RCS is in progress to raise temperature.
CHN-FIC-210X is in auto with an output of 50%.
The unit experiences a loss of NNN-D11.
After NNN-D11 has power restored, CHN-FIC-210X will be in….
A. Manual with 0% output.
B. Auto with 0% output.
C. Auto with 50% output.
D. Manual with 50% output.
A. Manual with 0% output.
The VCT outlet valve (CHN-UV-501) can be operated from the Control Room…
A. ONLY
B. And locally at PHA-M35
C. And the Remote Shutdown Panel
D. And locally at NHN-M72
D. And locally at NHN-M72
Unit is at 100% power in a normal lineup.
The MCC that supplies power to CHN-UV-514 is de-energized.
If a lo-lo level in the VCT now occurs, what is the status of the following valves?
CHN-UV-501, CHE-HV-536, CHN-UV-514
A. Open, Open, Closed
B. Closed, Open, Closed
C. Open, Closed, Closed
D. Closed, Closed, Open
B. Closed, Open, Closed