Demin and Domestic Water Flashcards

1
Q

Unit 1 is at 100% power with all systems in a normal lineup.
A large demand on the Demineralized Water system has dropped pressure at the pump discharge to 93 psig.
Based on these conditions, the standby DW pump is ___(1)___, and the system low pressure alarm is ___(2)___.
A. (1) running, (2) clear
B. (1) running, (2) in alarm
C. (1) not running, (2) clear
D. (1) not running, (2) in alarm

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which of the following loads is supplied by the Domestic Water (DS) system?
A. Condensate Pump seals
B. Turbine Building AHU air washer makeup
C. Non-nuclear sample coolers
D. Stator Cooling water makeup

A

B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
Which of the following loads is supplied by the Demineralized Water (DW) system?
A.  Eyewash stations
B.  Spray Pond makeup
C.  Normal Chilled Water makeup
D.  Instrument Air alternate cooling
A

C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly