Unit 1 is at 100% power with all systems in a normal lineup.
LT HDR SYS TRBL alarm has come in.
Letdown flow is 0 gpm.
Letdown backpressure is 600 psig and oscillating.
Which of the following actions should the RO perform?
A. Close Letdown Isolation Valve CHB-UV-515
B. Throttle open the in-service letdown backpressure control valve CHN-PV-201P
C. Throttle open the in-service letdown control valve CHN-LV-110P
D. Bypass the letdown ion exchangers with CHN-HS-520
A
Unit 2 is at 100% power with all systems in a normal lineup.
ESF service transformer NBN-X03 faults.
With no further operator action, what will be the condition of the following valves?
1) Letdown isolation valve CHB-UV-515
2) Letdown isolation valve CHA-UV-516
3) Letdown isolation valve CHB-UV-523
A. OPEN, OPEN, CLOSED
B. OPEN, CLOSED, OPEN
C. CLOSED, OPEN, OPEN
D. CLOSED, OPEN, CLOSED
C
Unit 2 is at 100% power with all systems in a normal lineup.
Nuclear cooling water pump NCN-P01A trips on overcurrent.
Nuclear cooling water pump NCN-P01B does not automatically start.
With no further operator action, what will be the condition of the following valves?
1) Letdown isolation valve CHB-UV-515
2) Letdown isolation valve CHA-UV-516
3) Letdown isolation valve CHB-UV-523
A. OPEN, OPEN, CLOSED
B. OPEN, CLOSED, OPEN
C. CLOSED, OPEN, OPEN
D. CLOSED, OPEN, CLOSED
A
Unit 3 is at 100% power with all systems in a normal lineup.
Nuclear cooling water pump NCN-P01A trips on overcurrent.
Nuclear cooling water pump NCN-P01B has a sheared shaft.
The CO cross-connects EW ‘A’ train to supply NC priority loads.
The RO has performed 40AO-9ZZ05, Loss of Letdown, Appendix C, Extended Operations Without Letdown, and has secured all charging pumps.
What is the expected pressurizer level trend?
A. Pressurizer level will rise by 10% in 55 minutes
B. Pressurizer level will lower by 10% in 55 minutes
C. Pressurizer level will rise by 5% in 55 minutes
D. Pressurizer level will lower by 5% in 55 minutes
B
Unit 3 is at 100% power with all systems in a normal lineup.
Nuclear cooling water pump NCN-P01A trips on overcurrent.
Nuclear cooling water pump NCN-P01B has a sheared shaft.
The CO cross-connects EW ‘A’ train to supply NC priority loads.
The RO has performed 40AO-9ZZ05, Loss of Letdown, Appendix C, Extended Operations Without Letdown, and has secured all charging pumps.
Which of the following events would automatically isolate cooling water to the RCPs?
A. Containment pressure of 5 psig
B. EW ‘A’ surge tank high level alarm
C. Pressurizer pressure of 2400 psia
D. Fault on normal service transformer NBN-X01
A
Unit 1 is at 100% power.
Charging Pump Selector Switch CHN-HS-4 is in 1-2-3.
CHE-P01, ‘E’ Charging Pump, is isolated for pulsation dampener adjustment.
All other systems are in a normal lineup.
CHA-P01, ‘A’ Charging Pump, trips on a ground fault.
CHB-P01, ‘B’ Charging Pump, continues to run.
CHB-UV-515 automatically closes on high regenerative heat exchanger outlet temperature.
Pressurizer level is 50% and trending down.
Pressurizer pressure is 2240 psia and trending down.
Which of the following actions should be taken first?
A. Perform 40AO-9ZZ12, Degraded Electrical Power, and restore PBA-S03.
B. Perform 40AO-9ZZ05, Loss of Letdown, and restore letdown.
C. Perform 40AO-9ZZ02, Excessive RCS Leakage, and commence a 4-hour plant shutdown.
D. Trip the reactor and enter 40EP-9EO01, Standard Post Trip Actions
D
Unit 3 is at 100% power with all systems in a normal lineup.
All four channels of RU-142, Main Steam Line N-16 monitor, go into HIGH ALARM.
The CRS enters 40AO-9ZZ02, Excessive RCS Leakage.
Letdown flow lowers to 77 gpm and stabilizes.
Which of the following actions will be performed to mitigate the consequences of this event?
A. Immediately trip the reactor and enter 40EP-9EO01, Standard Post Trip Actions
B. Immediately start the standby charging pump.
C. Close ASN-V014 and ASN-V015 to isolate the unit from the auxiliary steam cross-tie header.
D. Place Steam Bypass Control System in EMERGENCY OFF.
C
Unit 2 is at 60% power with all systems in a normal lineup.
‘A’ and ‘B’ Charging Pumps are running with Charging Pump Mode Selector CHN-HS-4 in 1-2-3.
Pressurizer level is 41% and lowering.
PZR TRBL, Tave-Tref HI-LO, and AUTOMATIC MOTION INHIBIT are in alarm.
Which of the following AOPs should be entered?
A. 40AO-9ZZ02, Excessive RCS Leakage
B. 40AO-9ZZ05, Loss of Letdown
C. 40AO-9ZZ11, CEA Malfunctions
D. 40AO-9ZZ16, RRS Malfunctions
D
Unit 1 is at 100% power with all systems in a normal lineup.
A leak develops downstream of CHA-HV-524, Charging Header Isolation Valve.
40AO-9ZZ02, Excessive RCS Leakage, is entered, and Appendix E is performed to align the alternate discharge for all three Charging Pumps.
Which of the following charging system functions will be made available through this lineup?
A. Seal injection
B. RCS dilution
C. Auxiliary Spray
D. RHX cooling for letdown
B
Unit 1 is at 100% power with ‘B’ LPSI pump tagged out for planned maintenance.
All other systems are in a normal lineup.
A leak develops downstream of CHA-HV-524, Charging Header Isolation Valve.
40AO-9ZZ02, Excessive RCS Leakage, is entered, and Appendix E is performed to align the alternate discharge for the ‘A’ Charging Pump.
Which injection lineup should be used for charging into the RCS?
A. SIE-V508, cold leg injection, with ‘A’ HPSI piping, using loop 1 injection valves.
B. SIE-V508, cold leg injection, with ‘A’ HPSI piping, using loop 2 injection valves.
C. SIE-V509, hot leg injection with ‘A’ HPSI piping.
D. SIE-V509, hot leg injection with ‘B’ HPSI piping.
B
Unit 2 is at 100% power with all systems in a normal lineup.
Regulating group 5 CEAs are at 135” withdrawn. All others are fully withdrawn.
RCN-TT-111X, Loop 1A temperature, fails low.
Which of the following will occur within the next fifteen seconds?
A. CEAs will step inward
B. CEAs will step outward
C. Letdown flow will rise
D. Letdown flow will lower
C
Unit 1 is at 100% power with all systems in a normal lineup.
‘B’ CSAS inadvertently actuates due to multiple fuse failures.
Which of the following describes an operational impact of this failure?
A. Cooling water flow will be isolated to the normal chillers
B. Instrument air will be isolated to containment
C. Letdown will isolate
D. RCP control bleedoff will be isolated from the VCT
D
Unit 3 is at 100% power with all systems in a normal lineup.
‘A’ CSAS inadvertently actuates due to multiple fuse failures.
With no operator action, which of the following describes an operational impact of this failure?
A. Cooling water flow will be isolated to the normal chillers
B. Instrument air loads in containment will be supplied by backup nitrogen
C. SG blowdown will isolate
D. Letdown flow will rise
C
IAN-PV-52, Nitrogen backup to Instrument Air, will automatically open at a low pressure of: A. 75 psig B. 85 psig C. 95 psig D. 105 psig
B
Unit 2 is at 100% power with all systems in a normal lineup.
A pipe break downstream of the instrument air dryers causes a rapid drop in IA pressure
The CRS directs a reactor trip.
Which of the following valves will fail closed as IA system pressure drops?
A. Condensate pump mini-flow valves
B. Main feed pump mini-flow valves
C. Steam Bypass Control Valves
D. Atmospheric Dump Valves
C
Unit 1 is at 100% power with all systems in a normal lineup.
The solenoid burns out on IAA-UV-2, IA isolation to containment.
The RO notes CHA-UV-506, Seal Bleedoff containment isolation valve, has gone closed.
With no further operator action, letdown flow will ___(1)___, and seal injection flow will ___(2)___.
A. (1) rise; (2) rise
B. (1) rise; (2) lower
C. (1) lower; (2) rise
D. (1) lower; (2) lower
C