Collapse Flashcards

0
Q

Structural fatigue/old age is a cause or indicator/sign of a collapse ?

A

Cause

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

According to CIMs structural collapse is what type of event?

A

Single command/FD IC for structural collapse. ABCDEF -boat in distress(1st), auto(1st),downed trees,confined space,h –,Impalement/entrapment,fires,structural collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If possible, both first & second arriving engines should?

A

Take separate hydrants outside the block on separate mains. 3rd/4th engines take similar positions in the rear

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who seals off ends of street?

A

Two second alarm engines.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Who establishes a staging area?

A

Initial IC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Eng Co responsibilities. What is 2 nd highest priority ?

A
  1. Ext active fires in affected bld & surrounding debris 2. Protect exposures 3. Extinguish vehicle fires in vicinity of collapse 4. No active fire - stretch & charge 2 1/2” – 3 1/2” stretched/charged to nearest TL 5. Terrorist 2 1/2” between two apparatus or other substantial shielding
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

First engine ?

A

Water supply. 2 1/2” stretch 2 1/2” for entire site. Consider 3 1/2” for TL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who ensures 3 1/2” stretched for 1 st TL ?

A

2nd eng. 1st considers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who immediately begins process of controlling utilities?

A

2nd ladder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Victim removal leader will normally be filled by?

A

Rescue Co Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who coordinates CCP with an EMS Officer?

A

Street Coordination Mgr.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Surveyor’s transit can be found?

A

Tactical support units & collapse rescue units

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

3 short blasts?

A

3 short: Evacuate the area. 1 long - 1 short: resume operations. 1 long: cease ops/quiet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

5 stages of collapse rescue operation?

A
  1. Recon 2. Acct for & removal of surface victims 3. Voids 4. Selected debris removal & tunneling 5. General debris removal
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In pancake collapse survival depends on?

A

Presence of strong objects nearby to keep the weight of the entire load from landing on the victim.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Crush syndrome is fundamentally based on three criteria:

A
  1. Compromised local circulation 2. Involvement of muscle mass 3. Prolonged compression - usually 4-6 hours but possibly less then 1 hour
16
Q

Victim location marking system assists during what phase?

17
Q

Marking system - they should be updated and old markings?

A

Crossed out

18
Q

When victim marking is complete draw a box around it?

A

No box. Square Box for vacant buildings

19
Q

Marking system ‘X’ should be what size?

A

2’ x 2’.

20
Q

What color paint for ‘X’ ?

A

Lime-YELLOW. (2) cans carried on apparatus

21
Q

/ means ?

A

Unit has entered. Second slash when units exit.

22
Q

Marking quadrants: upper ?

A

Upper - time & date unit left area/structure. Left - unit identity. Right - hazards ‘rats’. Bottom - number of live and/or expired victims still INSIDE the structure/area. “0” = no victims

23
Q

“V” ?

A

2’ in height - known or potential victim. An arrow may need to be added next to “V” pointing twd location of victim

24
A circle around "V" ?
Confirmed - either visually, vocally or hearing sounds
25
A line thru the "V" ?
Horizontal line thru middle of "V" --- victim deceased.
26
A vertical line thru "V"?
Victim removed. ** this marking should not be taken to mean the SECONDARY is NOT complete**
27
Wood frame building starting to slowly tilt or lean over to one side?
Lean over
28
Exterior wall breaks apart horizontally - top inward & bottom outward - what kind of wood bld collapses that way?
Wood braced frame. **Timber truss roof colllapse can cause secondary collapse of a front wall in this manner.
29
Floor beams pull loose or collapse at both ends?
Pancake
30
Interior partition or wall holds up center of the floor?
Tent floor collapse
31
Who can operate vacuum truck if area is too hazardous for Con-ed employees?
SOC members
32
Crush syndrome: compromised local circulation, involvement of muscle mass, prolonged compression usually __ to __hours but possibly less then an hour?
Usually 4 to 6 hours, possibly less then 1 hour.
33
Pancake collapse: survival depends on?
Strong objects near by
34
3 short blasts by Apparatus at collapse?
Evacuate. 1 long - quiet/ cease ops, 1 long 1 short - resume
35
Who does CFRD?
2nd 3rd 4th
36
Who can do removal of lightly buried victims in terms of engines?
3rd and subsequent engines