Master stream application
The most important question and infinite commander must ask is
At what point does this building no longer have any value when the life safety priority has been addressed and there’s no suitable property to protect the primary mission is over it’s time to put the fire out with a master stream
What is a large caliber device used primarily during defensive strategy operations they are also known as heavy stream and large caliber stream devices
Master stream
North master appliances are also used in ‘’’ attacks
Transitional
What are the two types of massive transitional attacks?
Offensive- defensive - risker
Defensive- offensive
A transitional attack is ‘’’ and used when there is more fire than ?
Defensive to offensive
1 3/4 inch and 2 1/2 inch hand lines are able to handle, but the building still has value and sable
What is an example of a pre-plumbed monitor that is defense to offensive transitional attack
Blitz attack
What should be one of the safest fires we fight?
Defensive
What zone is an area endangered by potential wall collapse of a building it is calculated by the distance out of the wall ‘’ the height of the involved building
Collapse zone, 1.5 times the height
Master stream appliances should be
As far away from the fire as possible without compromising their effectiveness p. 421
There are essentially how many types of master stream appliances… What are they?
3
Two are carried on engine ( fixed and portable )
1 on aerial ladder
Portable mass appliances are often referred to as
deluges
Monitors
Deck guns
Ladder pipe
The safety lock is provided so that the lock must be manually release before the barrel can be lowered below ‘’ angle
35° p. 424
Water supplied to the fixed appliance in one of two ways, which are
1- pre-plumbed to the appliance from a separate discharge gate on the pump
2 - supplied by hose lines with one or more connections to the pumpers discharge our. Can be melted on trucks.( monitors.)
Depending on the size carried on the monitor, it can flow between ‘’’ gpm, which gives only between’’’ seconds of water
500 to 1000 gallons per minute
30 to 60 seconds of water
Elevated platforms of’’’ or less rated vertical height must have a permanent water delivery system installed capable of delivering ‘’’ gallons per ‘’’ psi nozzle pressure with elevating platforms at its rated vertical height
110 feet
Thousand gallons per minute at 100 psi
Permanent waterways on both aerial ladders and elevating platforms must be arranged so that they can supply at ground level through an external intake. That is a minimum of.
4 inches