Chapter 11 Flashcards
Back up lines
What are the engine companies first line of defense?
Back up lines
’’ it is an additional hose line used to reinforce the work of Aunt to protect personnel when the initial attack proves in adequate or when a problem occurs with the initial hand line
Back up line
Back up lines should be ‘’’ size diameter of the initial attack on
Same size or larger p. 377
One or two rooms and content fires can usually be extinguished with
The initial Handline using less than 500 gallons
Two and half inch hose lines, approximately weighs per 50 foot section
106 pounds
It could take a crew of ‘’ to overcome the friction to advance a 2 1/2 half inch hose line effectively
4 to 5 ( at least three)
2 1/2 inch hand line for the back up is the best choice for what type of structure fires
Commercial
The back up line should stand ready the back up fire, but should not fight the fire along with the initial attack team. If another hose line is needed for Fire a second line should be the exception is fighting. ?? ‘’’’
type 2 noncombustible building fires we are non-protected open web steel are use for roof trust and floor assemblies
What steel means that the Steelers not covered a coded with fire resistance material
Non-protected
at Temperatures between ‘’’’’ steel expand, warp, twists and loses its tensile and compression strength it can collapse under its own weight within’’’ being subjected to this
1000°-1000 degrees , 5 to 10 minutes
In fighting what fires should the backup lines be used to cool open web steel bar trust at the ceiling and the steel columns that support them while they attack team focuses on the seat of the fire
Type two noncombustible fires p. 378
The back up line serves as what until a dedicated RIT line is laid
Initial RIT line
Residential structure, fire a minimum of ‘’ lines should be pulled . what are they and in what order should they be pulled ?
4
1. Attack line
2. Back up line 2-3 depends
3. Exposure line
4. RIT line p. 379
Let’s say that you have a one story, wood frame house with fire blowing out the windows on the B side and flames are binging on the D side of the exposure house next-door in this scenario how would you lay your lines?
- Attack line
- Exposure line
- Back up line
- RIT
Let’s say you have a two-story woodframe house on fire with Fire showing him from the kitchen on the floor one at the corner of the house and extending to floor two there are interior exposure bedrooms on floor two in flames are starting to show how LAY your lines
- Attack line.
- Exposure
- Back up line.
- RIT