Chapter 06: Site Selection Flashcards

1
Q

100-Year Flood

A

This refers to a flood level with a 1 percent chance of being equaled or exceeded in any given year; it does NOT refer to a flood that occurs every 100 years.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

500-Year Flood

A

This refers to a flood level with a 0.2-percent chance of being equaled or exceeded in any given year; it does NOT refer to a flood that occurs every 500 years.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Derecho

A

A widespread, long-lived wind storm. Derechos are associated with bands of rapidly moving showers or thunderstorms variously known as bow echoes, squall lines, or quasi-linear convective systems.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Green Field

A

A site that has not been previously developed; the process of building a data center on a clear site.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Grey Water

A

Reusable wastewater from residential, commercial, and industrial bathroom sinks, bathtub shower drains, and clothes washing equipment drains (EPA); non-potable water that does not contain serious or hazardous contaminants.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Sinkhole

A

A depression in the Earth’s surface caused by dissolving of underlying limestone, salt, or gypsum. Drainage is provided through underground channels that may be enlarged by the collapse of the cavern roof.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

List three one-time costs that may be significant such that any one may drive the site selection process for a data center.

A
  • Real estate
  • Local tax incentives
  • Environmental assessment consulting costs
  • Cost to bring adequate utilities infrastructure to site
  • Cost to provide redundant utilities
  • Demolition costs for any existing structures; site prep costs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

List 3 recurring costs that will have long-term effects on the feasibility of the proposed site for a data center.

A

Usage costs for utility services (power, water, gas, sewer)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What should be the minimum distance of a data center site from a 500-year flood hazard area?

A

91m (300’)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the desirable groundwater conditions when selecting a data center site?

A

The site should have a water table that is as low as possible; it should be below the utility ducts and below the lowest level of the building at a minimum.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A seemingly flat slope surface would not make a good site for a data center. Why?

A

Even small instabilities can cause a building to settle unevenly, thus leading to structural issues.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the desirable location of a data center that minimizes the threat from wind damage?

A

Areas with winds less than or equal to 54 m/s (120 mph) per ASCE 7.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Identify one way to decrease the probability of having a data center impacted by wildfires.

A

Do not place data centers on the edge of urban developments or near protected natural areas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the desirable distance of a data center from a freeway or other major arterial road?

A

3.2 km (2 mi) to 16 km (10 mi)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a desirable distance of a data center from a fire station?

A

Ideally, a staffed police and fire station should be within 8 km (5mi)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the desirable distance of a data center from a hospital?

A

16 km (10 mi)

17
Q

What should be the minimum separation of electrical service entrance feeds from other utilities along the entire route?

A

3.2 km (2 mi) to 16 km (10 mi)

18
Q

If redundant feeds are provided to the data center, what should be the minimum separation of the electrical service entrances to the facility from the other electrical service entrances along the entire route.

A

20 m (66’)

19
Q

What should be the minimum separation for redundant telecom service cabling pathways along the entire route?

A

20 m (66’)

20
Q

What is the recommended on-site supply of services for class F0 data centers?

A

There are no requirements for on-site supply of services for Class F0 data center.

21
Q

What is the recommended on-site supply of services for class F1 data centers?

A

A minimum of 8 hours of on-site supply of services.

22
Q

What is the recommended on-site supply of services for class F2 data centers?

A

A minimum of 24 hours of on-site supply of services.

23
Q

What is the recommended on-site supply of services for class F3 data centers?

A

A minimum of 72 hours of on-site supply of services.

24
Q

What is the recommended on-site supply of services for class F4 data centers?

A

A minimum of 96 hours of on-site supply of services.

25
Q

What should be the minimum separation of telecom services cabling from other utilities along the entire route?

A

1.2 m (4’)

26
Q

If the data center is situated in a heavily populated area, how may the risk of noise pollution be mitigated?

A

It is recommended that the data center be constructed with sound barriers within the architectural screening. Critical silencers on generator exhausts and sound attenuated enclosures on outdoor equipment, such as generators and cooling tower, should always be considered.

27
Q

The suitability of a site shall be determined by a site survey and evaluation and a __________ analysis

A

Risk

28
Q

What are the hazards a risk assessment should evaluate?

A
  • Natural hazards
  • Human-caused events
  • Technology caused events
29
Q

What is the recommended lighting flash rate for a data center site?

A

A rate of 10 or less

30
Q

Other than the risk of terrorist attacks, what are some reasons to avoid placing a data center near an underground train station?

A

Vibrations and EMI