Chapter 05: Project Documentation Flashcards
When looking at project drawings, P refers to what drawing?
Plumbing drawings, they indicate the size and route of portable water, specialized water, sanitized water, and rain water roof drain piping structures. P series drawings may indicate potential obstructions to the installation of wires and cables inside the building.
The drawings are important because they indicate the location of all components of the building and the structure itself. What is the name of these drawings?
Structural (S)
Name the types of drawings that indicate the size and route of fire suppression system piping and associated agent heads and nozzles within the structure.
Fire Protection (FP)
True or False: Cross-sectional and elevation drawings show the building profile and the floor-to-floor relationships within each building.
True
True or False: One-liner/riser diagrams show a schematic of the ICT riser cabling, horizontal cabling, plus pathways and spaces.
True
What is depicted in an AV system diagram?
- Audio flow
- Video flow
- Remote control system connection
- Simplified line drawings
What plans show an overhead dimensional relationship on each individual floor of telecommunications spaces, work area outlets, and primary pathways?
Floor plans
What is the purpose of NCS?
The purpose of NCS is to allow consistent and streamlined communication among owners and design/construction teams.
True or False: Adoption of the NCS by the building and construction industry is mandatory.
False. Adoption is voluntary; however, several government agencies have adopted the standard.
What is the name of the resource that is a standard system used to organize and manage construction drawings for virtually any project?
Uniform Drawing System (UDS)
What is a MasterFormat?
MasterFormat is a list of numbers and titles compiled to organize activities and requirements of a construction project.
MasterFormat is expressed in a six-digit format. what is the fourth number reserved for?
Assignment
List three documents that are typically included in project documentation.
- Project log
- QA plan
- Project safety plan
- RFI log
- Change orders
- Commissioning plan
- Acceptance plan
- Test Documentation
- Punch lists
- Closeout submittals
- Submittal forms and log
If a standard form for tracking daily activity is not available, what should be developed in its place?
A project log
What should a project log include?
The log should reflect a detailed log of all work undertaken in a day, whether work is complete, and plans for the following day.
True or False: The project team should keep a project log during all work operations that should begin on the first day and continue until the company vacates the site.
True
What does the PM use the project log for?
The PM will use the project log to record all activities associated with the project, especially important occurrences that may result in scope or financial changes.
What is the PM’s responsibility regarding the QA plan?
The PM should ensure all documents are logged, tracked, and archived. It is also important to ensure the QA closely matches the SoW of the project.
What is a submittal?
A submittal is any information that must be submitted to the design team for review and approval.
How are statuses of submittals tracked?
- Contract documents requirements listing
- Requirements tracking matrix
What should be included in a change order log?
- Date and time submitted
- Detailed subscription of change request
- Requestor’s name
- Written authorization
- Date and time approval received
This plan outlines the tasks, tools, staff, and skills necessary to test and document the successful completion of a project.
Acceptance plan
What should be included in a punch list?
- Walk-through punch list
- Participants
*Time and date - Record of completion
- Client acceptance
What warranties do contracts require the contractors to provide?
- An installation warranty
- Vendor/manufacturer performance warranty & extended equipment warranty
- Licensing agreements
True or False: The format used for the as-built drawings must be agreed upon prior to the beginning of the project so information can be gathered properly.
True
What should a commissioning plan document?
*Administration
*Labeling of all components
* O&M documentation
* Cleaning
* Testing, adjusting, and settings
* Training client personnel
* Warranty time period and licensing
What is a patching matrix?
A patching matrix is a detailed connection schematic plan to facilitate connecting active components to the infrastructure.