B1 - Plans/Specs - LT#3 Describe Schedules Flashcards
When are schedules used on construction drawings?
Mostly commercial, when there are many similar components.
When are drawings used as part of a schedule?
Whenever additional detail is needed.
List two types of building components that can be described in a schedule other than doors, windows, or rooms.
Footing sizes, plumbing fixtures and electrical fixtures.
What should be done prior to framing window openings in a building?
Check rough framing, ro sizes with the window manuf.
What additional information can be found in a window schedule other than the size of the window?
Opening type, frame type, outside, frame time.
What is the height of a door that is listed as “920 X 1020 X 45” ?
W = 920
H = 1020
THICKNESS = 45”
W920 X H1020 X Thick 45”