Atlas Methods of Compensation 1 Flashcards
- Percentage based on project construction cost
- Unit cost method
- Value-based pricing/percentage of gross rentals
Percentage-based fee
Government project, detailed contract on the scope of work, prone to abuse
Lump-sum or fixed fee
- Multiple of direct personnel expenses
- Professional fee plus expenses
- Per diem, honorarium plus reimbursable expenses
- Salary cost times a multiplier, plus direct cost or reimbursable expenses
- Per diem or hourly basis
- Retainer
Time basis
Series of project
Professional fee plus expenses
Consulting services
Salary cost times a multiplier, plus direct cost or reimbursable expenses
Activities outside the office, per appearance
Per diem or hourly basis
Only when needed
Retainer
How long have you finished the work, excluding creative work
Time basis
- Multiple of direct personnel expense (MDPE), multiplier ranges from 1.5 to 2.5 depending on the office set-up, overhead, experience, and complexity of the project
- Professional fee + expenses
- Lump-sum or fixed fee
- Per diem, honorarium + reimbursable expenses
- Mixed methods of compensation
SPP Doc. 201 - Pre-Design Services
If assigned to places over 100 km. from the area of operation of the architect, transportation, housing, and living allowance of consultant; transportation, per diem, housing, and a living allowance of local consultants and technical staff
Reimbursable expenses
Per appearance
Per diem
- Percentage of project construction cost (PCC)
- Multiple of direct personnel expenses (MDPE)
- Professional fee + expenses
- Lump-sum or fixed fee
- Per diem, honorarium + reimbursable expenses
- Mixed methods of compensation
SPP Doc. 202 - Regular Design Services
With a single contract between the architect and owner, and sub-consultancy contracts between the architect and the other professionals working with the architect. (Full service)
Detailed Architectural and Engineering Design Services (DAEDS)
With the architect and the engineering and allied professionals executing separate contracts with the owner
Detailed Architectural Design Services (DADS)
DADS is ___% of the DAEDS fee.
60%
Group ___
Simplest utilization and character
Group 1
Armories Bakeries Habitable Agricultural Buildings Freight Facilities Hangars Industrial Buildings Manufacturing/Industrial Plants Other similar utilization type buildings Packaging and Processing Plants Parking Structures Printing Plants Public Markets Service Garages Simple Loft-Type Buildings Warehouses
Group 1
Group 1 Recommended Professional Fee (RPF)
5% of PCC for P50M or less (DAEDS)
3% of PCC for P50M or less (DADS)
Group ___
Moderate complexity of plan/design
Group 2
Art Galleries Banks, Exchange, and Other Buildings Financial Institutions Bowlodromes Call Centers Churches and Religious Facilities City/Town Halls & Civic Centers College Buildings Convents, Monasteries, & Seminaries Correctional & Detention Facilities Court Houses/Halls of Justice Dormitories Exhibition Halls & Display Structures Fire Stations Laundries & Cleaning Facilities Libraries Malls/Mall Complexes Motels & Apartels Multi-Story Apartments Nursing Homes Other buildings of similar nature or use
Group 2