Abandonment D 020 Flashcards

1
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

D 020

  • 1) objective of well abandonment is?
  • 2) Which abandonment operations require AER approval prior to work beginning -Non routine
  • 3) minimum length of the cement plug that is added on top of a previously abandoned zone? 30 vertical meters
A
  • Cover all non-saline groundwater (TDS <4000 mg/L) &
  • to isolate or cover all porous zones
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

4) IF an abandoned will is leaking who must be notified and what agreement must be in place?

  • Notify mineral rights owner
  • Have an active …
A
  • Notify mineral rights owner
  • Have an active surface lease agreement
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

5) Open-hole abandonment for wells not in the oil sands area, fillers and/or additives can be used in the cement plugs as long as the compressive strength is a minimum of _____________kPa after curing 48 hours.

A
  • 3500 kPa
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

6) What is TVD?

  • True Vertical Depth

7) What must occur in a cased-hole abandonment?

The licensee must…

A

abandon each completed pool separately and cover all non-saline groundwater with cement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

8) Where can inhibitor fluid not be used?
* Must not be used inside the casing ove*r

A

intervals that are above the BGWP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

9) For wells without liners, what pressure must the casing string be tested at?

For how long?

A

Stabilized pressure of 7000kPa

for 10 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

10) What is a GM problem? When testing shows the

presence of gas migration

11) What is surface abandonment?

A

The cutting off of casing strings and capping of a well

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

12) Surface abandonment must be completed how soon after downhole abandonment?

-One year

13) Before any planned surface abandonment begins, what do you do with affected parties?

A

Must inform all affected parties (landowner and/or occupant)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

14) When is the casing string cut off? 1M? 2M?

Are these minimum or maximum depths and in relation to what?

  • 1M is typical
  • 2M for…
  • minimum depths
  • final contour elevation
A

special farming practices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Build the skeleton TAG for an abandoned pipeline. List all the criteria on it.

  1. T
  2. L
  3. L
  4. Oe
  5. Doa
  6. Amliop
A
  1. Tag#
  2. Licensee:
  3. Line #:
  4. Other endpoints:
  5. Date of abandonment:
  6. Abandonment media left inside of pipe:
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

18) What must occur prior to the beginning of any surface abandonment operation?

  • Test and inspect to ensure no wellbore problem
  • Typical tests include:

-

-

-

A

Surface Casing vent flow tests

Gas Migration tests

Fluid Level Tests

How well did you know this?
1
Not at all
2
3
4
5
Perfectly