What are the power sources for Unit 1 Control Room Lighting?
- 600V Bus 11A -> Normal Lighting TR 9S (South) -> ABT-1 and -2
- 600V Bus 11C -> Standby Lighting TR 8 -> ABT-1 and -2
- Backup supply from MCAB 250 VDC
What is the power source for Unit 1 Turbine Building Lighting (TE1E and TE1W)?
- 600V Bus 11D -> Normal Lighting TR 9N (North)
What is the power source for Unit 1 Containment Lighting (CAM)?
- 600V Bus 11D -> Containment Lighting TR 10
What is the power source for Unit 1 Aux Building Lighting?
- Normal: 600V 11A -> TR 9S (South) -> AB1E and AB1W
- Standby: 600V 11C -> TR 8 -> 1PSBE and 1PSBW
What are the power sources for Unit 2 Control Room Lighting?
- 600V 21D -> Normal Lighting TR 9N (North) -> ABT-1 and -2.
- 600V 21C -> Standby Lighting TR 8 -> ABT-1 and -2.
- Backup supply from MCAB 250 VDC.
What is the power source for Unit 2 Turbine Building Lighting (TE2E and TE2W)?
600V 21A -> Normal Lighting TR 9S (South)
What is the power source for Unit 2 Containment Lighting (CAM)?
600V 21D -> Containment Lighting TR 10
What is the power source for Unit 2 Aux Building Lighting?
- Normal: 600V 21D -> TR 9N (North) -> AB2E and AB2W
- Standby: 600V 21C -> Standby Lighting TR 8 -> 2PSBE and 2PSBW
What is the concern for power sources for Unit 2 lighting?
If Train A (21C and 21D) are lost:
- Power is lost to all three Control Room Power (CRP) Panels
- Both AC sources for CR Lighting are lost
What is the power source for CRID 1?
- Primary: MCCD 250 VDC
- Alternate: EZC-C (600V 11/21C)
What is the power source for CRID 2?
- Primary: MCCD 250 VDC
- Alternate: EZC-D (600V 11/21D)
What is the power source for CRID 3?
- Primary: MCAB 250 VDC
- Alternate: EZC-A (600V 11/21A)
What is the power source for CRID 4?
- Primary: MCAB 250 VDC
- Alternate: EZC-B (600V 11/21B)
What effect does CRID normal power source OOS have on Tech Specs?
- CRID inverter is INOPERABLE
- CRID Bus is OPERABLE
What effect does a CRID being powered from CRP-3 have on Tech Specs?
- CRID Bus is INOPERABLE
What function does a CRID Inverter “ALT Source to Load” PB do?
Electronically transfers the static switch to the Alternate Source
What function does a CRID Inverter “Inverter to Load” PB do?
Transfers the load from the Alternate Source to the Inverter
What function does a CRID Inverter “Manual Output Selecter” Switch do?
Allows the inverter to be bypassed while maintaining a source of power from the Alternate Source.
- Make-before-Break
What does the “In Synch” light LIT on a CRID Inverter mean?
Alternate power supply is available.
What is the power source for CRP-1 and CRP-2?
- AB1W (AB2W)
OR - 1(2) PSBW
Via ABT-3
What is the power source for CRP-3?
- AB1E (AB2E)
OR - 1(2) PSBE
Via ABT-5
What is the power source for Unit 1 CCRP?
- MCCD 250 VDC
OR - EZC-D (600V 11/21D)
What is the power source for Unit 2 CCRP?
- MDAB 250 VDC
OR - EZC-A (600V 11/21A)
What is the power source for RPI?
- CRP-3