What are the power sources for Unit 1 Control Room Lighting?
- 600V Bus 11A -> Normal Lighting TR 9S (South) -> ABT-1 and -2
- 600V Bus 11C -> Standby Lighting TR 8 -> ABT-1 and -2
- Backup supply from MCAB 250 VDC
What is the power source for Unit 1 Turbine Building Lighting (TE1E and TE1W)?
- 600V Bus 11D -> Normal Lighting TR 9N (North)
What is the power source for Unit 1 Containment Lighting (CAM)?
- 600V Bus 11D -> Containment Lighting TR 10
What is the power source for Unit 1 Aux Building Lighting?
- Normal: 600V 11A -> TR 9S (South) -> AB1E and AB1W
- Standby: 600V 11C -> TR 8 -> 1PSBE and 1PSBW
What are the power sources for Unit 2 Control Room Lighting?
- 600V 21D -> Normal Lighting TR 9N (North) -> ABT-1 and -2.
- 600V 21C -> Standby Lighting TR 8 -> ABT-1 and -2.
- Backup supply from MCAB 250 VDC.
What is the power source for Unit 2 Turbine Building Lighting (TE2E and TE2W)?
600V 21A -> Normal Lighting TR 9S (South)
What is the power source for Unit 2 Containment Lighting (CAM)?
600V 21D -> Containment Lighting TR 10
What is the power source for Unit 2 Aux Building Lighting?
- Normal: 600V 21D -> TR 9N (North) -> AB2E and AB2W
- Standby: 600V 21C -> Standby Lighting TR 8 -> 2PSBE and 2PSBW
What is the concern for power sources for Unit 2 lighting?
If Train A (21C and 21D) are lost:
- Power is lost to all three Control Room Power (CRP) Panels
- Both AC sources for CR Lighting are lost
What is the power source for CRID 1?
- Primary: MCCD 250 VDC
- Alternate: EZC-C (600V 11/21C)
What is the power source for CRID 2?
- Primary: MCCD 250 VDC
- Alternate: EZC-D (600V 11/21D)
What is the power source for CRID 3?
- Primary: MCAB 250 VDC
- Alternate: EZC-A (600V 11/21A)
What is the power source for CRID 4?
- Primary: MCAB 250 VDC
- Alternate: EZC-B (600V 11/21B)
What effect does CRID normal power source OOS have on Tech Specs?
- CRID inverter is INOPERABLE
- CRID Bus is OPERABLE
What effect does a CRID being powered from CRP-3 have on Tech Specs?
- CRID Bus is INOPERABLE
What function does a CRID Inverter “ALT Source to Load” PB do?
Electronically transfers the static switch to the Alternate Source
What function does a CRID Inverter “Inverter to Load” PB do?
Transfers the load from the Alternate Source to the Inverter
What function does a CRID Inverter “Manual Output Selecter” Switch do?
Allows the inverter to be bypassed while maintaining a source of power from the Alternate Source.
- Make-before-Break
What does the “In Synch” light LIT on a CRID Inverter mean?
Alternate power supply is available.
What is the power source for CRP-1 and CRP-2?
- AB1W (AB2W)
OR - 1(2) PSBW
Via ABT-3
What is the power source for CRP-3?
- AB1E (AB2E)
OR - 1(2) PSBE
Via ABT-5
What is the power source for Unit 1 CCRP?
- MCCD 250 VDC
OR - EZC-D (600V 11/21D)
What is the power source for Unit 2 CCRP?
- MDAB 250 VDC
OR - EZC-A (600V 11/21A)
What is the power source for RPI?
- CRP-3
OR - ELSC
What is the power source for Emergency Lighting?
Receives trickle voltage from local lighting panels to the solid state battery charger.
What is the power source for TSC-UPS?
- The three TSC-UPS inverters receive power from either the TSC battery chargers (Normal) or the TSC-UPS battery (Backup)
- The three TSC-UPS inverter static switches and bypass switches can be powered from 600V 11(21)A via an Isolimiter.
What is the power source for the TSC-UPS Battery Chargers?
- 600V 11(21)C
OR - 600V Security Bus
What is the Auto-Retransfer Lockout Sequence?
- If the normal supply is lost, the inverter static transfer switch switches to the alternate supply.
- If the normal supply returns, 30 seconds later the inverter static switch retransfers to the normal supply.
- The Auto-Retransfer Lockout feature is now locked out unit the Auto-Retransfer Reset PB is pressed. (Light is LIT)
- If the PB is not pressed and the normal supply is lost, the inverter static switch will transfer to the alternate supply and NOT retransfer.
The 250 VDC Batteries are sized to ensure power for how many hours during a LOOP?
3 hours
The 250 VDC Batteries are sized to ensure power for how many hours during a SBO?
4 hours
The BOP Battery is sized to ensure power for how many hours during a LOOP?
2 hours
How do ground detection lights indicate a ground?
Of the 3 lights, the one that goes out or is much dimmer than the others indicates a ground.
Which 250 VDC battery has more capacity and why?
U1 CD (train A) Battery.
- It has additional loads
What is the power source for the BOP Battery Chargers?
600V BMC/CMC
What is the power source for the CD (Train A) Battery Chargers?
- Charger 1 from 11(21)D via EZC-D
- Charger 2 from 11(21)C via EZC-C
What is the power source for the AB (Train B) Battery Chargers?
- Charger 1 from 11(21)A via EZC-A
- Charger 2 from 11(21)B via EZC-B
What happens to current draw as a battery is expended?
Rise steadily until the design battery capacity is exhausted.
What happens if there is a differential sensed on BMC or CMC Transformer?
- Low side and high side breakers immediately open and the tie-breaker closes
- There is no 30 cycle delay!