TS 3.5.3 ECCS - Operating Flashcards
LCO 3.5.3
2 ECCS trains shall be OPERABLE
APPLICABILITY: ___
MODES 1 and 2
MODE 3 with PZR pressure > 1837 psia or with RCS Tc > 485F
The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
a. ___
b. ___
c. ___
d. ___
a. LOCA
b. CEA ejection accident
c. Loss of secondary coolant accident, including uncontrolled steam release or loss of FW
d. SGTR
The addition of negative reactivity is designed primarily for ___ because ___
…Loss of secondary coolant accident
…because primary cooldown could add enough positive reactivity to achieve criticality and return to significant power
There are 2 phases of ECCS operation:
1 ___
2 ___
- Injection
2. Recirculation
Each ECCS train consists of ___ and ___
HPSI and LPSI subsystems
LCO 3.5.3 helps to ensure that the following acceptance criteria, established by 10 CFR 50.46 for ECCSs, will be met following a LOCA:
a. ___
b. ___
c. ___
d. ___
e. ___
a. Max fuel element cladding temperature is < 2200F
b. Max cladding oxidation < .17 times total thickness
c. Max H2 generation from a Zirconium water reaction is < .01 times hypothetical if all metal were to react
d. Core maintained in coolable geometry
e. Adequate long term cooling capability maintained
LCO 3.5.3 also limits the potential for a post-trip return to power following a ___ and ensures that CTMT temp limits are met.
Steam Line Break (SLB)
LCO 3.5.3 CONDITION
A. One LPSI subsystem inoperable.
A.1 Restore subsystem to OPERABLE status (7 days)
The availability of at least ___% of the ECCS flow equivalent to a single OPERABLE ECCS train is implicit in the definition of Condition A.
100%
LCO 3.5.3 CONDITION
B. 1 or more trains inoperable for reasons other than Condition A.
AND
At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.
B.1 Restore train(s) to OPERABLE status (72 hours)
An ECCS train is inoperable if ___
…it is NOT capable of delivering the design flow to the RCS.
The intent of this Condition is to maintain a combination of OPERABLE equipment such that ___
…100% of the ECCS flow equivalent to 100% of a single OPERABLE train remains available.
LCO 3.5.3 CONDITION
C. Required Action and associated Completion Time not met.
C.1 Be in MODE 3 (6 hours) AND C.2 Reduce PZR pressure to < 1837# (12 hours) AND C.3 Reduce Tcold to < 485F (12 hours)
Per SR 3.5.3.1, A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve auto repositions within ___
…the proper Stroke Time
Per SR’s 3.5.3.4-6, the following valve actuations MUST be verified:
___
“on an actual or simulated RAS, the CTMT sump isolation valves open, and the HPSI, LPSI and CS minimum bypass recirculation flow line isolation valves and combined SI mini flow valve close.”