LCO 3.1.5 All FSCEA’s shall be OPERABLE, and all FS and PSCEAs shall be aligned to within ___ inches (indicated position of all other CEAs in their respective groups.
APPLICABILITY: ___
6.6 inches
Applicable in Modes 1 and 2.
If a CEA is discovered to be immovable but remains triable and aligned, the CEA is considered OPERABLE or NOT OPERABLE?
OPERABLE
If a CEA is immovable, a determination of ___ of that CEA must be made, and appropriate action taken.
Trippability (OPERABILITY)
Each CEDM moves its CEA one step (~ ___) at a time…
(~3/4 inch)
The ___ CEAs also provide reactivity (power level) control during normal operation and transients.
Regulating CEAs
The part strength CEAs are used solely for ___
ASI control
The ___ CEA position indicating system indicates CEA position to the actual step, if each CEA moves one step for each command signal.
Pulse Counting
- If each CEA does NOT follow commands, system will incorrectly reflect position of affected CEA (COLSS Operability potential)
The acceptance criteria for addressing CEA inoperability or misalignment are that:
There shall be NO violations of:
1.___
2.___
- Specified acceptable fuel design limits, or
2. RCS Pressure boundary integrity
Three types of misalignment are distinguished. They are ___, ___ and ___
Misalignment within deadband (<6.6 inches)
Misalignment in excess of deadband and,
CEA/subgroup drop
The last type of misalignment occurs when one CEA or subgroup drops partially or fully into the reactor core. This event causes ___
Initial power reduction followed by return towards original power due to positive reactivity feedback from negative MTC.
- Increased peaking during the power increase may result in erosion of DNB margin
Misalignments within deadband are evaluated to ensure ___ are NOT exceeded.
Specified acceptable fuel design limits (SAFDLs)
The most rapid approach to the DNBR SAFDL or the fuel centerline melt SAFDL is caused by ___ with CEACS In-Service and either a ___ or ___ with CEACS OOS.
A Single full strength CEA drop with CEACS IS
12 finger or subgroup drop with CEACS OOS
Failure to meet the requirements of this LCO may produce unacceptable ___, ___, and ___ or unacceptable ___, all of which may constitute initial conditions inconsistent with the safety analysis.
Power Peaking factors, DNBR and LHRs
or unacceptable SDMs
The requirements on CEA OPERABILITY and alignment are applicable in MODES 1 AND 2 because these are the only MODES in which ___, and the OPERABILITY and alignment of CEAs have the potential to affect the safety of the plant.
Neutron (or fission) power is generated
LCO 3.1.5 Condition
A. One or more CEAs trippable and misaligned from its group by >6.6 inches and <9.9 inches OR
One CEA trippable and misaligned from its group by >9.9 inches
A.1 Reduce THERMAL POWER in accordance with the limits in the COLR (1 Hour) AND
A.2 Restore CEA alignment (2 Hours)