TS 3.1.5 Control Element Assembly (CEA) Alignment Flashcards

1
Q

LCO 3.1.5 All FSCEA’s shall be OPERABLE, and all FS and PSCEAs shall be aligned to within ___ inches (indicated position of all other CEAs in their respective groups.

APPLICABILITY: ___

A

6.6 inches

Applicable in Modes 1 and 2.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If a CEA is discovered to be immovable but remains triable and aligned, the CEA is considered OPERABLE or NOT OPERABLE?

A

OPERABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If a CEA is immovable, a determination of ___ of that CEA must be made, and appropriate action taken.

A

Trippability (OPERABILITY)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Each CEDM moves its CEA one step (~ ___) at a time…

A

(~3/4 inch)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The ___ CEAs also provide reactivity (power level) control during normal operation and transients.

A

Regulating CEAs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The part strength CEAs are used solely for ___

A

ASI control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The ___ CEA position indicating system indicates CEA position to the actual step, if each CEA moves one step for each command signal.

A

Pulse Counting

  • If each CEA does NOT follow commands, system will incorrectly reflect position of affected CEA (COLSS Operability potential)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The acceptance criteria for addressing CEA inoperability or misalignment are that:
There shall be NO violations of:
1.___
2.___

A
  1. Specified acceptable fuel design limits, or

2. RCS Pressure boundary integrity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Three types of misalignment are distinguished. They are ___, ___ and ___

A

Misalignment within deadband (<6.6 inches)
Misalignment in excess of deadband and,
CEA/subgroup drop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The last type of misalignment occurs when one CEA or subgroup drops partially or fully into the reactor core. This event causes ___

A

Initial power reduction followed by return towards original power due to positive reactivity feedback from negative MTC.

  • Increased peaking during the power increase may result in erosion of DNB margin
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Misalignments within deadband are evaluated to ensure ___ are NOT exceeded.

A

Specified acceptable fuel design limits (SAFDLs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The most rapid approach to the DNBR SAFDL or the fuel centerline melt SAFDL is caused by ___ with CEACS In-Service and either a ___ or ___ with CEACS OOS.

A

A Single full strength CEA drop with CEACS IS

12 finger or subgroup drop with CEACS OOS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Failure to meet the requirements of this LCO may produce unacceptable ___, ___, and ___ or unacceptable ___, all of which may constitute initial conditions inconsistent with the safety analysis.

A

Power Peaking factors, DNBR and LHRs

or unacceptable SDMs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The requirements on CEA OPERABILITY and alignment are applicable in MODES 1 AND 2 because these are the only MODES in which ___, and the OPERABILITY and alignment of CEAs have the potential to affect the safety of the plant.

A

Neutron (or fission) power is generated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

LCO 3.1.5 Condition
A. One or more CEAs trippable and misaligned from its group by >6.6 inches and <9.9 inches OR

One CEA trippable and misaligned from its group by >9.9 inches

A

A.1 Reduce THERMAL POWER in accordance with the limits in the COLR (1 Hour) AND

A.2 Restore CEA alignment (2 Hours)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Per the COLR. Figure 3.1.5-1 Core Power reduction after CEA deviation requires what power reductions?

A

100% to 80% - 20%
70% to 80% - 15%
45% to 70% - 10%
< 45% - 5%

  • At 35% RTP, further reduction isn’t required
17
Q
No Power reduction is required for a single CEA misalignment if the following conditions are continuously met from the time of deviation:
\_\_\_\_
\_\_\_\_
\_\_\_\_
\_\_\_\_
A
  1. > 95% RTP
  2. COLSS In-Service and CEACs IS
  3. Azimuthal Power Tilt is < 3%
  4. All CEAs remain > 142.5” withdrawn by Pulse Counters and > 140.1” withdrawn by RSPT Indication
18
Q

Per Action A.2 (Restore CEA alignment), the 2 hour period is sufficient to:
___
___
___

A

a. ID cause of misaligned CEA
b. Take appropriate corrective action to realign the CEAs
c. Minimize effects of Xenon redistribution

19
Q

LCO 3.1.5 Condition

B. Only 1 CEA position indicator channel OPERABLE for 1 CEA per CEA group

A

B.1 Restore at least 2 position indicator channels to OPERABLE status (6 Hours) OR

B.2 Verify the CEA Group(s) with the inoperable position indicators are fully withdrawn or fully inserted while maintaining the insertion limits of LCO 3.1.6, 3.1.7 and 3.1.8 (6 Hours AND Once per 12 Hours thereafter)

20
Q

At least 2 of the following 3 CEA position indicator channels shall be OPERABLE for each CEA:

a. ___
b. ___
c. ___

A

a. CEA (RSPT 1) with capability of determining absolute CEA positions < 5.2”
b. CEA (RSPT 2) with capability of determining absolute CEA positions < 5.2”, AND
c. The CEA Pulse Counting position indicator channel

21
Q

Additionally, the ___ CEA reed switches provide an acceptable indication of CEA position for a fully withdrawn condition.

A

Upper Electrical Limit (UEL)

22
Q

LCO 3.1.5 Condition
C. Required Action and associated Completion Time of Condition A or B not met OR

One or more FSCEAs untrippable

A

C.1 Be in MODE 3 (6 Hours)

23
Q

The allowed Completion Time of 6 hours is reasonable, based on OE, for reaching MODE 3 from full power conditions in an orderly manner and without challenging plant systems. The specified ramp rate is intended to ensure ___ are not challenged.

A

DNBR SAFDLs

24
Q

Continued operation is allowed with a untrippable PSCEAs if the ___ and ___ are met.

A

Alignment and Insertion Limits are met

25
Q

LCO 3.1.5 Condition

D. 2 or more CEAs trippable and misaligned from their group by >9.9 inches

A

D.1 Open the reactor trip breakers (Immediately)

26
Q

With 2 or more CEAs misaligned more than 9.9”, this is a situation outside the ___ and immediate action would be required to prevent any ___

A

Design Basis

prevent any potential fuel damage

27
Q

Per SR 3.1.5.3, individual FSCEA’s are exercised to provide confidence that all FSCEAs continue to be trippable. A movement of ___ is adequate to demonstrate motion without exceeding the alignment limit when only 1 FSCA is being moved.

A

5 inches

28
Q

SR 3.1.5.5 Verify each FSCEA drop time ___

A

Is Less than or Equal to 4 seconds

  • 4 seconds is MAX time for fully withdrawn FSCEA to reach 90% insertion position when electrical power is interrupted to CEDM’s with RCS Tcold > 550F and all RCPs operating