TS 3.3.2 RPS - Shutdown Flashcards

1
Q

LCO 3.3.2 Four trip and bypass removal channels for each Function in Table 3.3.2-1 shall be OPERABLE

APPLICABILITY: ___

ACTIONS: ___

A

APPLICABILITY:

  • Log Power HI (M3, M4, M5)
  • SG1 or SG2 Pressure LO (M3)

ACTIONS: NOTE
* Separate condition entry is allowed for each RPS Function

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

LCO 3.3.2 CONDITION

A. One or more Functions with one automatic RPS trip channel inoperable.

A

A.1 Place channel in bypass or trip (1 hour)
AND
A.2 Restore channel to OPERABLE status (Prior to M2 following next M5 entry)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

LCO 3.3.2 CONDITION

B. One or more functions with two automatic RPS trip channels inoperable.

A

B.1 Place one channel in bypass and place other in trip (1 hour)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

LCO 3.3.2 CONDITION

C. One or more functions with one automatic bypass removal channel inoperable

A

C.1 Disable bypass channel (1 hour)
OR
C.2.1 Place affected channel in bypass or trip (1 hour)
AND
C.2.2 Restore bypass removal channel and associated automatic trip channel to OPERABLE status (Prior to M2 following next M5 entry)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

LCO 3.3.2 CONDITION

D. One or more functions with two automatic bypass removal channels inoperable.

A

D.1 Disable bypass channel (1 hour)
OR
D.2 Place one affected automatic trip channel bypass and place other in trip (1 hour)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LCO 3.3.2 CONDITION

E. Required Action and associated Completion Time not met.

A

E.1 Open all RTCB’s (1 hour)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For Log Power HI, the Trip may be bypassed when log power is ___.

Bypass shall be auto removed when log power is ___

A

bypass when > 1E-4%

bypass auto removed <1E-4%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Besides the Modes of Applicability, the 3 Functions also require ___ to make the LCO applicable.

A

Any RTCB’s closed and any CEA capable of being withdrawn.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which Function is “Noncredited” and is purely equipment protective?

A

SG Water Level HI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Log Power Level HI trip protects ___

A

The integrity of the fuel cladding AND RCPB in unplanned criticality from shutdown condition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

SG Pressure LOW trip function provides ___

A

SDM to prevent or minimize return to power, following a MSLB in M3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly