Per TS 3.9.4, SDC and Coolant Circulation - High Water Level, how many SDC Loops shall be operable and in-operation?
ONE
Applicability: M6 with water level >23’ above flange
TS LCO 3.9.1 requires Boron to hold RX Core subcritical under cold conditions. What system is credited to maintain those conditions?
CVCS
Per TS LCO 3.9.2, if we have 1 required SRM Inoperable, what are the actions (Condition A)?
A.1. Suspend Core Alts (Immediately) AND
A.2. Suspend Positive RX Adds (Immediately)
Per TS LCO 3.9.2, how may SU range monitors shall be OPERABLE?
2
Applicability: Mode 6
* Enter 3.3.12 BDAS if made inoperable by SRM’s
U2 in M6. SDC “A” OOS. Using SDC “B”.
What level must be maintained in RCS?
> 23’ above flange
Need 2 SDC Loops Operable if <23’
ENG reported fuel cavity is 135’. What is done if we only have 1 SDC Loop?
Add 2’ of water is option, but can’t keep moving fuel (3.9.5 to 3.9.4)
When is TS LCO 3.9.3 CTMT Penetrations Applicable? And what is required if 1 or more penetrations are NOT in required status?
During CORE ALTS
A.1. Suspend CORE ALTS (Immediately) AND
A.2. Suspend Fuel Movement (Immediately)
Can you move FUEL <23’ above the flange?
YES
- Only when fuel being moved are NEW and not Irradiated (only INITIAL Load)
Per TLCO 3.9.100, how long SHALL the RX be subcritical prior to fuel movement?
100 Hours
- If LESS, Suspend all OPS Immediately
If 1 FBEV’s is NON-FUNCTIONAL during movement of irradiated fuel assemblies in the Fuel Bldg, what is required, and how long can you do it (TLCO 3.9.104)?
A.1. Verify Functional FBEVS train capable of being powered from emergency source (Immediately) AND
A.2. Restore FBEVS to Functional (7 Days)
Why do we maintain SOLUBLE BORON in SFP?
SDM
< .95 kEFF
Why do TS LCO 3.9.4 and 3.9.5 allow for off-load to continue with stopping SDC < 1 hour out of 8?
Permits Core Mapping, Core Alts near Hot Legs and/or ST’s
Per TS LCO 3.3.8 (CPIAS) what is it the backup system to during Modes 1,2,3 and 4?
CIAS
Closes CTMT purge valves in event of HI RAD levels from primary leak in CTMT
Per TS LCO 3.3.4, Condition D, If the Unit is at 80%, RTCB’s have problems on Channels 1 and 3 what do we do?
Open 1 and 3 Immediately
100% power, RCS PRESS HI Channel A FAILED, BUT No RTCB’s are open, what does TS LCO 3.3.4 require?
OPEN or OPEN Redundant (in 1 hour) AND OPEN the Affected RTCB (48 Hours)