Reactor Trip EOP Flashcards

1
Q

SAFETY FUNCTION

1. REACTIVITY CONTROL

A

Acceptance Criteria:

a. RX Power dropping OR RX Power is < 2x10-4% and stable or lowering
b. ALL FSCEA’s are fully inserted OR Boration in progress > 40 GPM OR Adequate SDM as required by Tech Specs is established

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SFSC

2. MAINTENANCE OF VITAL AUXILIARIES

A

a. At least 1 vital 4.16kV AC bus energized
b. At least 1 non-vital 13.8kV AC bus energized
c. At least 1 non-vital 4.16kV AC bus energized
d. At least 1 of following trains of PK and PN is energized and is on same train as the powered vital 4.16kV AC bus:
* PKA-M41, PKC-M43, PNA-D25
* PKB-M42, PKD-M44, PNB-D26

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

SFSC

3. RCS INVENTORY CONTROL

A

a. PZR Level 10-65%
b. PZR Level trend to 33-53%
c. RCS 24F or more subcooled
d. RVLMS indicates 100% RVUH (Head Full)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

SFSC

4. RCS PRESSURE CONTROL

A

a. PZR Pressure 1837-2285 PSIA

b. PZR Pressure trend to 2225-2275 PSIA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

SFSC

5. CORE HEAT REMOVAL

A

a. RCS DeltaT is < 10F

b. RCS is 24F or more subcooled

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

SFSC

6. RCS HEAT REMOVAL

A

a. RCS Tcold is 560-570F

b. At least 1 SG level 45-60% (NR) and FW available OR FW restoring level in at least 1 SG to 45-60% (NR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

SFSC

7. CONTAINMENT ISOLATION

A

a. CTMT Pressure < 2.5 PSIG
b. No valid CTMT area rad monitor alarms or unexplained rise in activity
c. No valid steam plant activity rad monitor alarms or unexplained rise in activity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

SFSC

8. CONTAINMENT TEMPERATURE AND PRESSURE CONTROL

A

a. CTMT temperature < 117F

b. CTMT pressure < 2.5 PSIG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

REACTOR TRIP

ENTRY CONDITIONS:

A

Enter RX Trip when BOTH conditions exist:

  • SPTA’s have been performed
  • Plant conditions indicate uncomplicated RX Trip occurred
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

IF Main Spray is being used with less than 4 RCP’s running, OR Aux Spray is being used THEN PERFORM ___

A

Appendix 6, Spray Valve Actuation Data Sheet

  • Less Bypass flow, impacts DeltaT, more fatigue to Valves
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

IF steaming to atmosphere, THEN inform ___

A

RP and the RMS Technician

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

IF at least 1 HPSI Pump is operating AND ALL of the following conditions are satisfied: ___

THEN close the HPSI Injection Valves and stop the HPSI Pump(s)

A
  • RCS is 24 or more subcooled
  • PZR Level > 10% and NOT lowering
  • At least 1 SG available for RCS Heat Removal with level being maintained or restored to 45-60% NR
  • RVLMS indicates RVUH level is 16% or more
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. WHEN RX power is 2x10-6% or less, THEN PERFORM ___
A

Appendix 8, BDAS Check

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. Monitor all of the following (SFP items):
A
  • SFP Temp is < 125F
  • SFP Cooling is in operation
  • SFP Level is > 137’6”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly