Reactor Trip EOP Flashcards
SAFETY FUNCTION
1. REACTIVITY CONTROL
Acceptance Criteria:
a. RX Power dropping OR RX Power is < 2x10-4% and stable or lowering
b. ALL FSCEA’s are fully inserted OR Boration in progress > 40 GPM OR Adequate SDM as required by Tech Specs is established
SFSC
2. MAINTENANCE OF VITAL AUXILIARIES
a. At least 1 vital 4.16kV AC bus energized
b. At least 1 non-vital 13.8kV AC bus energized
c. At least 1 non-vital 4.16kV AC bus energized
d. At least 1 of following trains of PK and PN is energized and is on same train as the powered vital 4.16kV AC bus:
* PKA-M41, PKC-M43, PNA-D25
* PKB-M42, PKD-M44, PNB-D26
SFSC
3. RCS INVENTORY CONTROL
a. PZR Level 10-65%
b. PZR Level trend to 33-53%
c. RCS 24F or more subcooled
d. RVLMS indicates 100% RVUH (Head Full)
SFSC
4. RCS PRESSURE CONTROL
a. PZR Pressure 1837-2285 PSIA
b. PZR Pressure trend to 2225-2275 PSIA
SFSC
5. CORE HEAT REMOVAL
a. RCS DeltaT is < 10F
b. RCS is 24F or more subcooled
SFSC
6. RCS HEAT REMOVAL
a. RCS Tcold is 560-570F
b. At least 1 SG level 45-60% (NR) and FW available OR FW restoring level in at least 1 SG to 45-60% (NR)
SFSC
7. CONTAINMENT ISOLATION
a. CTMT Pressure < 2.5 PSIG
b. No valid CTMT area rad monitor alarms or unexplained rise in activity
c. No valid steam plant activity rad monitor alarms or unexplained rise in activity
SFSC
8. CONTAINMENT TEMPERATURE AND PRESSURE CONTROL
a. CTMT temperature < 117F
b. CTMT pressure < 2.5 PSIG
REACTOR TRIP
ENTRY CONDITIONS:
Enter RX Trip when BOTH conditions exist:
- SPTA’s have been performed
- Plant conditions indicate uncomplicated RX Trip occurred
IF Main Spray is being used with less than 4 RCP’s running, OR Aux Spray is being used THEN PERFORM ___
Appendix 6, Spray Valve Actuation Data Sheet
- Less Bypass flow, impacts DeltaT, more fatigue to Valves
IF steaming to atmosphere, THEN inform ___
RP and the RMS Technician
IF at least 1 HPSI Pump is operating AND ALL of the following conditions are satisfied: ___
THEN close the HPSI Injection Valves and stop the HPSI Pump(s)
- RCS is 24 or more subcooled
- PZR Level > 10% and NOT lowering
- At least 1 SG available for RCS Heat Removal with level being maintained or restored to 45-60% NR
- RVLMS indicates RVUH level is 16% or more
- WHEN RX power is 2x10-6% or less, THEN PERFORM ___
Appendix 8, BDAS Check
- Monitor all of the following (SFP items):
- SFP Temp is < 125F
- SFP Cooling is in operation
- SFP Level is > 137’6”