Inadvertent PPS-ESFAS AOP Flashcards
When an ESFAS actuation occurs, the very first thing that the operator MUST do is ___
…VERIFY that the actuation is Valid
Equipment which operated on an inadvertent PPS-ESFAS actuation that has been placed in override or an anti-pump condition ___
…may be INOPERABLE based on Plant conditions and MODE
An AFAS actuation will feed cold CST water into the SG’s, which may cause ___
…a positive reactivity insertion and subsequent power excursion due to cool down of SG’s (and cooling of RCS cold legs)
For inadvertent AFAS, the instructions will first direct the operator to ___
…Override and Operate the AF valves as needed to control SG Level.
- May isolate SG blowdown, address effects on power and SG chemistry
Sustained low speed operations of AFAP01 should be avoided. Pump sleeve bearings and pump internals can be damaged due to ___
…Loss of Lubrication
AFA-P01 operations requirements include:
___
___
___
- Minimum idle speed is 800 RPM
- Minimum sustained speed is 1000 RPM
- Operation > 5 minutes with speed < 1000 RPM is prohibited and 40AO-9ZZ17 required operator to trip AFAP01
The inadvertent CIAS actuation section of the procedure will be entered ONLY if ___
…the CIAS isn’t accompanied by inadvertent SIAS
An inadvertent CIAS would isolate ___
- Letdown
- WC to CTMT
- RCS Sampling
- CTMT Sumps
- RU-1 (CTMT Rad Monitor)
- Procedure guides to restore all of these (ZZ05)
Isolation of CTMT Sumps and RU-1 will put us in the following LCO’s:
___
LCO 3.4.16.D which requires entry into 3.0.3
- To exit 3.0.3 must restore CTMT Sump monitoring
For a CS pump that has been anti-pumped and needs to be restarted and a SIAS has NOT actuated, then an ___
…AO will need to Cycle the breaker Control Power
Inadvertent CSAS has operator FIRST stop the actuated CS pump. Direction it then given to close the open CS Header Isolation Valve; this is done to ___
…prevent RWT from draining into CTMT thru this open valve.
Relief valves were installed on the NC return header inside CTMT. This prevents the possibility of hydraulically locking the NC CTMT Isolation valves OPEN after an ___
…HPSC leak pressurizes the NC system
If component cooling water to an RCP and motor oil lube systems is NOT available, or an oil leak occurs during operation, operator is alerted as soon as cooling to oil system is lose and has a time period of ___
…at least 30 minutes in which to reduce power
- Bearing seizure concerns
An inadvertent CSAS isolates IA to CTMT, therefore the following valves will Fail Closed: \_\_\_ \_\_\_ \_\_\_ \_\_\_
- CHAUV516 Letdown to Regen HX
- CHBUV515 Letdown to Regen HX
- SGAUV500P SG 1 Common Upstream Iso Valve
- SGBUV500R SG 2 Common Upstream Iso Valve
- First take HS for each valve to CLOSE prior to opening IA to CTMT when restored. Would be uncontrolled restore of LD and BD
On an inadvertent MSIS and RX Power < 5%, the operator is directed to ___
…control SG Pressure with ADV’s and establish feed to SG’s with AFAP01 and AFBP01