1
Q

When an ESFAS actuation occurs, the very first thing that the operator MUST do is ___

A

…VERIFY that the actuation is Valid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Equipment which operated on an inadvertent PPS-ESFAS actuation that has been placed in override or an anti-pump condition ___

A

…may be INOPERABLE based on Plant conditions and MODE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

An AFAS actuation will feed cold CST water into the SG’s, which may cause ___

A

…a positive reactivity insertion and subsequent power excursion due to cool down of SG’s (and cooling of RCS cold legs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For inadvertent AFAS, the instructions will first direct the operator to ___

A

…Override and Operate the AF valves as needed to control SG Level.

  • May isolate SG blowdown, address effects on power and SG chemistry
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Sustained low speed operations of AFAP01 should be avoided. Pump sleeve bearings and pump internals can be damaged due to ___

A

…Loss of Lubrication

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

AFA-P01 operations requirements include:
___
___
___

A
  1. Minimum idle speed is 800 RPM
  2. Minimum sustained speed is 1000 RPM
  3. Operation > 5 minutes with speed < 1000 RPM is prohibited and 40AO-9ZZ17 required operator to trip AFAP01
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The inadvertent CIAS actuation section of the procedure will be entered ONLY if ___

A

…the CIAS isn’t accompanied by inadvertent SIAS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

An inadvertent CIAS would isolate ___

A
  1. Letdown
  2. WC to CTMT
  3. RCS Sampling
  4. CTMT Sumps
  5. RU-1 (CTMT Rad Monitor)
  • Procedure guides to restore all of these (ZZ05)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Isolation of CTMT Sumps and RU-1 will put us in the following LCO’s:
___

A

LCO 3.4.16.D which requires entry into 3.0.3

  • To exit 3.0.3 must restore CTMT Sump monitoring
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

For a CS pump that has been anti-pumped and needs to be restarted and a SIAS has NOT actuated, then an ___

A

…AO will need to Cycle the breaker Control Power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Inadvertent CSAS has operator FIRST stop the actuated CS pump. Direction it then given to close the open CS Header Isolation Valve; this is done to ___

A

…prevent RWT from draining into CTMT thru this open valve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Relief valves were installed on the NC return header inside CTMT. This prevents the possibility of hydraulically locking the NC CTMT Isolation valves OPEN after an ___

A

…HPSC leak pressurizes the NC system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If component cooling water to an RCP and motor oil lube systems is NOT available, or an oil leak occurs during operation, operator is alerted as soon as cooling to oil system is lose and has a time period of ___

A

…at least 30 minutes in which to reduce power

  • Bearing seizure concerns
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
An inadvertent CSAS isolates IA to CTMT, therefore the following valves will Fail Closed:
\_\_\_
\_\_\_
\_\_\_
\_\_\_
A
  1. CHAUV516 Letdown to Regen HX
  2. CHBUV515 Letdown to Regen HX
  3. SGAUV500P SG 1 Common Upstream Iso Valve
  4. SGBUV500R SG 2 Common Upstream Iso Valve
  • First take HS for each valve to CLOSE prior to opening IA to CTMT when restored. Would be uncontrolled restore of LD and BD
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

On an inadvertent MSIS and RX Power < 5%, the operator is directed to ___

A

…control SG Pressure with ADV’s and establish feed to SG’s with AFAP01 and AFBP01

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
On an inadvertent RAS, IF SDC was lost as a result of the running LPSI pump trip, THEN perform the following for the previously running train:
\_\_\_
\_\_\_
\_\_\_
\_\_\_
A
  1. Throttle LPSI SDCHX Bypass valve to 20% open
  2. Close both LPSI Injection valves on appropriate train
  3. Override and start the LPSI Pump
  4. Restore SDC Flow
17
Q
On an inadvertent SIAS or SIAS/CIAS, the AOP requires the following actions:
\_\_\_
\_\_\_
\_\_\_
\_\_\_
\_\_\_
\_\_\_
A
  1. RCS < 2000# = Override and stop running HPSI’s
  2. RCS < 300# = And LPSI not used for SDC, override and stop LPSI pumps
  3. Reset PZR Heaters as needed for pressure control
  4. If LD isolated, reduce CH Pumps to 1 and perform Loss of Letdown AOP
  5. Restore CEDM cooling if necessary
  6. If necessary, override and operate SDC valves as needed for RCS Temperature control
18
Q

A ___ trips both the CTMT Normal and CEDM ACU’s

A

SIAS

19
Q

If the SIAS signal were reset before the ACU’s were returned to service, the SIAS Start Interlock would still prevent the ACU’s from running. The HS must be ___

A

…placed to STOP; this clears the interlock, allows auto-start

20
Q

SI Pump mini-flow valves close on a RAS to prevent ___

A

…flow of water to the RWT, which precludes contamination of the RWT and increases in dose in the area of the RWT.

21
Q

Runtimes > 1 hour for SI Pumps on mini-flow require ___

A

…evaluation by Engineering