E-PLAN Flashcards

1
Q

What is EPLAN Purpose?

A
  1. Describe organization
  2. Classify emergencies per severity
  3. Defines/Assigns responsibilities
  4. Outlines course of actions
  5. Presents post-emergency plans, restore normal
  6. Defines methods/process to inform public
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which facility serves as the point of origin for the Environmental Teams and Repair Teams?

A

OSC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which facility is responsible for providing Protective Action Recommendations?

A

EOF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

At onset of incident, the EC has what NON-DELEGABLE responsibilities?

A
  1. Notify Offsite Response and Emergency Orgs (EOD relief later)
  2. Provide PAR’s (EOD relief later)
  3. Reclassify events
  4. Determine need for site evac
  5. Activate ERO for Alert or Higher
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How is transfer of EPLAN command and control accomplished? And what duties?

A

Form EP-0240

EC-TSC = Classifications, Exposure controls, KI
EC-EOF = PAR's, Notifications
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When would the EC or EOD authorize deviation from the Safety Manual and related Safety procedures?

A
  1. Extreme Circumstances
  2. Maintain/Restore Core Cooling
  3. Mitigate Off-Site release in progress
  4. Fuel damage is imminent
  5. EPLAN is ALERT or higher classification
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who is responsible for dispatch and tracking of Emergency Teams? And what actions are URGENT?

A

The EC has responsibility

  1. Firefighting, Search and Rescue, Lifesaving
  2. Bomb Search
  3. HAZMAT (Urgent to High)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The EC controls AO access into plant areas, but what does he NOT direct for AO’s?

A

Plant Manipulations

  • The OSC gives AO direction (on-shift AO’s are directed from CR)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If the SM is physically unable to fulfill EPLAN requirements, what is done both when a transient is IN PROGRESS and NOT IN PROGRESS?

A

NOT = CRS is responsible for EPLAN

IN PROGRESS = CRS is responsible to assign an EC qualified individual (other units SM’s, etc)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If it is suspected that multiple units may meet or exceed an EAL prior to initial classification, who is designated as On-Shift EC?

A

U1 Shift Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe UNUSUAL EVENT

A
  1. Potential Degradation of Safety
  2. Indicate Security threat
  3. No release requiring off-site expected
  4. Activates ON-SHIFT ERO
  5. Notify NRC, State, County
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe ALERT

A
  1. Actual or Potential substantial Degradation
  2. Threat due to Hostile Action
  3. Release are expected to be Limited
  4. Activate All ERO
  5. Prompt follow up to off-site authorities
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Describe Site Area Emergency

A
  1. Major Failures of plant functions
  2. Hostile Action (intentional damage/malicious)
  3. Releases shouldn’t exceed EPA PAG beyond site
  4. Activate ALL ERO
  5. Assembly/Accountability of ONSITE
  6. ONSITE non-essential must be evacuated on SAE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Describe General Emergency

A
  1. Actual or Imminent Core Degradation/Melt
  2. Potential Loss of CTMT integrity
  3. Hostile Action (loss of facility control)
  4. Releases will exceed EPA PAG off-site
  5. Prompt NRC, State, County notification
  6. ONSITE EVAC required
  7. State of AZ response, evacuate public
    * PAR consideration now at GE only level
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What can indicate an EAL classification?

A
  1. Instrument reading
  2. Equipment Status Indicator
  3. Measurable Parameter
  4. Discrete, Observable Event (or phenomenon)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the EAL Recognition Categories?

A
R =  Radiological
F = Fission Product Barrier
S = System Malfunction
H = Hazard
E = ISFSI
C =  Cold
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

When would we enter the EP-0901 Classification?

A

Any situation where an EAL may have been exceeded or when a classification change may be necessary for an emergency event already in progress

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

When multiple simultaneous events occur, which classification is used?

A

The highest EAL reached

  • If 2 events in same category, use more specific
19
Q

If we “Miss” a classification, what do we do?

A
  1. Event is reported to NRC within 1 Hour of discovery of undeclared event/condition (per 10CFR50.72)
  2. Also notify State/Local per agreements
20
Q

If an EAL is briefly met during an expected (normal) plant response, do we make an emergency declaration?

Or do we declare when an EAL is Momentarily met but corrected by an operator?

A

NO in both cases (if we hadn’t declared before correction by Operator in case 2)

21
Q

Per EP-0903, how do we determine if abnormal Radioactive Release is “In-Progress”?

A
  1. Effluent monitor readings 3X Normal/Expected
  2. SGTR with steam release to atmosphere
  3. Airborne activity found via survey
  4. Effluent grab samples > Expected
  5. > ALERT alarm on RU-148/149
22
Q

A radioactive release in excess of Federally approved limits is indicated when?

A
  1. High alarm on any effluent monitor
  2. Dose projection/sample > .05 mrem/hr TEDE at Site boundary
  3. Radiation survey ? .05 mrem/hr DDE at Site Boundary
  4. Grab samples > ODCM Section 3 Limits
23
Q

When do we make Protective Action Recommendations (PARS)?

A

When offsite doses are expected to exceed Protective Action Guides (PAG’s)

  • Based on Emergency Classification, Status of Fission Product Barriers, and offsite doses
24
Q

Why do we issue Potassium Iodide?

A

Reduce potential Thyroid Doses

25
Q

List Protective Action responsibilities

A

PV issues PAR’s
Governor of AZ makes PAD’s
Maricopa County implements PAD’s

*PAD - Protective Action Decision

26
Q

Who provides the Fuel Damage Category?

A

STA (STSC) or Reactor Analyst (TSC)

27
Q

When is ASSEMBLY required?

A

SAE or Higher

28
Q

When is ACCOUNTABILITY required?

A

Within the PA at SAE (within 30 minutes)

29
Q

Who decides to Evacuate? Who is evacuated and when?

A

EC decides

Non-Essential at SAE or GE

30
Q

What do we use EP-0541 form for?

A

Transmit key plant and emergency status info to State and Local agencies

  • 15 minutes from Event Classification, Release status, PAR’s
31
Q

Where can HARD COPIES of EP-0541 be found?

A

Control Room (in EPLAN binder)

32
Q

How long does Security have to notify the EC with results of Accountability report?

A

Within 30 minutes

33
Q

What are the TEDE Exposure Limits during an Emergency?

A
  1. EPA overall < 5REM
  2. EPA for property 5-10 REM
  3. EPA for life-saving <25 REM
  4. EPA for life-saving (voluntary) >25 REM
34
Q

How do we select a worker for assisting during an Emergency?

A
  1. No previous emergency exposure
  2. No females with pre-natal dose limits
  3. Volunteer preferred
  4. Workers over 45 years old
  • Document on EP-0300
35
Q

EP-0902 requires the NRC be notified of any EPLAN entry within?

A

1 Hour

36
Q

What are the EP-0902 reporting requirements for the ENS Communicator?

A
  1. Shall notify NRC immediately after State and Local notifications and no later than 1 hour after declared
  2. Notify NRC via ENS until relieved
37
Q

Who may perform the ENS Communicator role?

A

STA, or an AO/RO

  • In the TSC, the USNRC Liaison is filled by Training Dept Supervisors
38
Q

What is the MINIMUM PAR for a GE?

A

Evacuate within 2-mile radius and 5-mile in affected sectors

39
Q

When do we enter SAMG’s?

A

Once decided EOP’s aren’t sufficient (EC decide)

  • SAMG performed by STA in TSC
40
Q

When CR EC transfers Non-Delegable duties, what facilities and what duties are transferred?

A

To TSC = KI issuance, ERO Activation, Classifications

To EOF = Notifications, PAR’s

41
Q

Where are the EPLAN facilities physically located (Onsite vs Offsite)?

A
ONSITE = CR, STSC, OSC, TSC
OFFSITE = EOF, JIC
42
Q

During Transient EPLAN management, who can take EC duties?

A

CRS/SM can transfer to qualified STA

43
Q

When making ZONE determinations during PAR’s, how do we add/delete identified zones?

A

Can only ADD zones as scenario plays out. Can NOT Delete zones.