SIM LOIT Review Flashcards
How do CHA-UV-505 and 506 FAIL?
Fail CLOSED on Loss of Air or Power
U1 has a LOOP. PKA-M41 has just failed as well. What is status of CBO?
It is re-established with loss of M41
What is the purpose of DFWCS “RTO”?
Prevent a post-trip overcooling transient
Without Spray Pond support, how long can the EDG’s run?
2.6 Minutes Loaded
15 Minutes Unloaded
On a loss of 2 PN busses, what would we expect without Operator action?
RX TRIP and Full ESFAS Actuation
On a SIAS and a LOP, what happens to NNN-D11/12/15/16?
D11 and 12 = Transfer to Class MCC’s
D15 = De-energized
D16 (U1/2) = De-Energized
D16(U3) = Transfer to Class MCC
When do PZR safeties relieve?
2475 PSIA
On a loss of IAA-UV-2 what is impact to CVCS?
515 and 516 close
- UV-2 closes on CSAS “A” and Loss of PKA
What are the flow rates for SI PUMPS for a 1 Hour MIN FLOW LIMIT and UNLIMITED run times?
CS = 150 GPM (1 Hour) / 2100 GPM (UNL) LPSI = 100 GPM (1 Hour)/ 2400 GRPM (UNL) HPSI = 85 GPM (1 Hour)/ 225 GPM (UNL)
What do we classify Primary to Secondary Leakage as?
IDENTIFIED LEAKAGE
As PZR LVL lowers, what type of actions would be taken to STOP the lowering (if can’t stop lowering)?
- Start ALL available CH Pumps
- Isolate LD
- Trip RX
What alarms would we expect if Letdown was to ISOLATE (Time Critical Action-10 Minutes)?
- HI REGEN OUTLET TEMP
- LD LOW PRESSURE
- LD RAD MONITOR LOW FLOW
What are the ways that CHN-UV-231P (Seal Injection Isolation valve) FAILS?
- Fails Open on Loss of Air/Power
2. Closes on HI-HI (150F) or LO-LO (70F), take open to reset (Temp inst. fails = doesn’t close)
The RVLMS normally has a delta of 90F, what would indicate a VOID?
Delta of 200F or HJTC > 700F
How is Turbine Cooling Water temperature maintained during Normal Ops?
Adjusting HX Outlet valve and Bypass valve
U1 just had NBN-X03 fail. What impact does this failure have on NC Pumps?
NO Effect
Both NC”A” and NC”B” pumps have tripped. EW has been cross-tied for Priority Loads. 30 minutes later what is status of the plant, assuming no further OPS actions?
Normal Ops with Letdown secured
For the NC PSV’s (614/615) inside CTMT on the return line…what do they ensure?
Closure of CIV’s in event of RCP HP Seal Cooler tube rupture
On a Loss of PW at Power, what is performed per the Loss of CW AOP?
Trip RX and Perform SPTA’s
PLANT ANNUNCIATORS
Due to the differences in arrangement of power supplies between units, the following will occur on a loss of NKN-M45 with a SIAS:
Units 1 and 2 ___
Unit 3 ___
Units 1 and 2: Loss of ALL annunciators
Unit 3: Loss of 1/2 of the annunciators
- Difference is U3 NNN-D16 backup supply is from PHB-M38 (not a SIAS load shed panel)