TB 94 - Asbestos Flashcards

1
Q

Effective October 1, 1990 the fire department implemented a program which requires a division 5 permit and on-site inspection of all asbestos-abatement projects of over how many square feet?

A

100 square feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Division 5 permits are obtained from who?

A

Bureau of fire preventions engineering unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Asbestos containing material (ACM) contains fibers from how many microns?

A

1 to 20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Wet asbestos creates how great of a hazard than dry asbestos?

A

Less

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A permit for asbestos abatement is good for how many days from the date issued?

A

180 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In high rise buildings that have had the insulation with asbestos removed from structural steel are required to be replaced within how many days?

A

15 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Asbestos sign removal lettering shall be a minimum of what size on contrasting background?

A

3” x 1/2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In all cases where the use of red duct tape is required for identifying the location of safety items, the tape shall be a minimum of how many inches wide?

A

3”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A maximum of what percentage of the total floor space may be under active abatement at any one time?

A

50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A minimum of 1 what kind of extinguisher shall be maintained at electrical panels, at each corner of the work area, 5 feet from external entry of shower room from work area and “clean room”?

A

4A/60BC dry chem extinguisher

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When placing a 4A/60BC dry chem extinguisher at each corner of the work area, 4 extinguishers shall be placed around the exterior wall so that they are approximately what percent of the total distance apart?

A

25%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

During abatement, all extinguishers shall remain active, sprinkler heads may be covered with a thin what thickness plastic bag?

A

.003”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When asbestos abatement is taking place, how many copies of the plot plan shall be provided by the contractor for permit?

A

3 copies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly