TB 126 - Metro Gold Line Extension Flashcards
The metro gold line extension project will span how many miles?
6 miles
The metro gold line extension project will be completed in what year?
2009
The metro gold line project will have how many miles of tracks below grade in underground tunnels?
1.8 miles
How far apart are the 2 tunnel boring machines placed apart?
25 feet
The metro gold line east extension tunnel depth will be how many feet below grade?
40 feet
How far apart of the 2 1/2” outlets located for the project?
Every 200 feet
During tunnel construction, intrinsically safe fans of what CFM provide ventilation and evacuate air from tunnel?
100,000 CFM
The intrinsically safe fans evacuate side from tunnel through how large of a vent pipe?
72 inch
Who has the ability to reverse the direction of the airflow of the fans if required during emergencies?
The contractor
The tunnel boring machine is approximately how many feet long?
300 feet
The tunnel boring machine can tunnel up to how many feet a day?
100 feet
What are the combustible around the tunnel boring machine limited to?
Hydraulic oil and lines
How large of an area does the shield protect around the front of the TBM?
20 feet
How many 8-passenger diesel locomotives move the the muck cars?
2
How long are the locomotives?
21 feet