The MRCTC project will provide an underground light rail system connecting the what to the 7th/Fig station?
Metro gold line
What is the expected completion date for the MRCTC?
2020
When did excavation for the tunnel construction begin?
September 2014
What are the 3 new underground stations that will be implemented in the project?
1st/central
2nd/broadway
2nd place/Hope
What is the budget for the project?
1.366 billion dollars
How long is the addition from
The metro rails little Tokyo/arts district to the 7th/fig station?
1.9 miles
The connector will provide a 1 seat ride between Azusa and what between east LA and Santa Monica (phase II) without transferring lines?
Long Beach
The what site is located between the 1st and alameda branches of the alignment?
“Mangrove”
The what will provide the design build contractors use and space for a tunnel boring machine (TBM)?
“Mangrove”
The 1st street/central avenue cut and cover station ends beneath the intersection of 1st and alameda, the alignment splits into how many directions?
2
The what will be constructed by cut-and-cover excavation methods, with branches extending to east and north?
“Wye” (2 legs of a true eye)
The eastern branch extends approximately how many feet within a cut-and-cover excavation to the beginning of an open trench structure?
419 feet
The open trench structure extends approximately how many feet father east toward the end of the alignment along 1st street?
401 feet
The northern branch adjacent to alameda street extends approximately how many feet within a cut and cover excavation to the beginning of an open trench structure?
812 feet
The open trench structure extends approximately how many feet farther north to the beginning of an above grade section?
409 feet
The depth of the excavation will range from a few feet approximately how many feet farther north to the beginning of an above grade section?
409 feet
The depth of the excavation will range from a few feet to approximately how many feet?
45 feet
Along the 1,354 foot long section of the cut and cover tunnels (flower street), the depth of the excavation will range approximately how many feet?
50 to 55 feet
For the 1st/central station, the depth of the excavation will be approximately how many feet below existing ground surface?
45 to 50 feet
For the 2nd/broadway station, the depth of the excavation will be approximately how many feet below existing ground surface?
95 to 100 feet
For the 2nd/Hope station, the depth of the excavation is approximately how many feet below the sidewalk elevation adjacent to hope and general Thaddeus kosciuszko way?
105 feet
For the 2nd/Hope street station, the depth of the excavation will be approximately how many feet below the existing ground surface at the west end of the station?
85 feet
Where is the 1 minded crossover structure located?
Immediately east of the 2nd street/broadway station
The 1 minded cross over structure is how many feet in length?
289 feet
The finished internal dimensions of the 1 minded crossover structure would be approximately how many feet wide and high?
56 feet wide
30 feet high
Ground cover over the cavern is approximately how many feet?
60 feet
Cross over caverns are anticipated that they will be constructed using what to enlarge the previously bored tunnels?
Sequential evacuation methods (SEM)
There is a possibility that during tunneling operation, pockets of what gas may be encountered?
Methane
Cal OSHA has listed the project as what and has identified hazard mitigation through use of a ventilation system and constant air monitoring?
“Potentially gassy”
All what will run the entire length of the tunnel?
Utilities
How large of a pipe provides a water system for cooling the TBM and water for firefighting operations?
46”
The project is equipped with 2 1/2” NST outlets every how many feet?
200 feet
Intrinsically safe fans with how many CFMs provide ventilation and evacuation air from the tunnel through a 66” pipe?
100,000 cfms
The limits of the stations, crossover cavern, 2 end sections and the cut and cover tunnel section result in 3 reached of what bored tunnels?
Twin bored tunnels
The TBM provide an excavation diameter of how many feet?
22 feet
What reach extends from 1st/central to a crossover cavern a distance of 2,273 feet?
Reach 1
For reach 1, the depth of cover will range from approximately how many feet tunnel crown and existing ground surface?
2 to 65 feet
What reach extends east/southeast from 2nd/Hope a distance of 1,630 feet?
Reach 2