What is the SCOPE of Surveillance Testing?
Applicable to all SR’s in Tech Specs and TRM
For a failed step, without an Out of Tolerance data entry, what is done?
Circle the Initial space for the failed step
If OOT data entry, Circle the OOT data entry
What is the alteration, variation, manipulation or adjustment of physical condition of an SSC before TS or TRM surveillance or ASME Code testing is done?
Preconditioning
What is done if an ST is ABORTED prior to completion?
Explanation of circumstances noted in ST Log
Restoration steps completed as applicable and normal acceptance review conducted
Who is responsible for both the Technical and Admin accuracy of an ST?
Acceptance Reviewer (must be qualified to perform ST)
Who reviews IST of Safety Related Pumps? How long do they have to complete the review?
SM/CRS within 96 hours of completion of the acceptance review.