1
Q

When would a CRS direct MANUAL reactor trips or Manual initiation of ESF?

A

When RPS trip setpoints are approached and manual action by operator or auto ops is unlikely to prevent reaching the setpoints

When setpoints have been exceeded and no trip

ESF initiate when auto ESF setpoints are approached or exceeded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

List the MINIMUM shift manning.

A

1 SM, 1 CRS and 2 RO’s per crew (4 total)

1 RO assigned as Fire Team advisor

4 AO’s per crew required and 1 AO for Area 9 (outside), total of 13 AO’s

At least 1 AO on site must be Radwaste qualified

3 STA’s are required OR 2 STA’s and added RO/SRO designated as NRC Communicator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How long can shift manning be Reduced below MINIMUM levels?

A

Up to 2 hours for unexpected absences. Allows time to find replacement. (Not applicable to SM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where should the CRS be located?

A

At the controls area OR Briefing area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who owns the “Command and Control” function? When can it be turned over?

A

CRS. Can turn over to another active SRO if leaving CR. In Modes 5,6, can be turned over to SRO or RO.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is considered a “Status Change”?

A

When a component is manipulated and left unattended

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which “Skill of the Craft” tasks required CR notification?

A

Makeup to DG JW subsystem
Surge tank level adjustments
Resetting alarms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who authorizes issuance of a VITAL AREA key?

A

Shift Manager

Lets Security SL know. Keys can ONLY be issued to APS personnel (no contractors), and shall NOT be removed from PA.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When would we enter a MANUAL SESS alarm?

A

If any ES monitored components are disabled or rendered unable to perform its design functionby a method that isn’t alarmed and will last longer than a shift

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who can approve voluntary entry into 3.0.3?

A

OPS Director

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If 10CFR50.54(x) is enacted, what is the time required to notify the NRC Ops Center?

For 10CFR72.32(d)?

A

1 hour notification (50.54x)

4 hour notification (72.32d)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When placing an auto controller in MANUAL, what must occur?

A

Highest controller level should be used.
CRS Concurrence (to manual and back to auto)
Crew Update

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who controls Dry Cask storage operations?

A

Shift Manager

Respective unit SM owns until cask gets to ISFSI. Unit 1 owns ISFSI operations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who communicates Dry Cask LCO entry/exit times?

A

DCS Loading Coordinator reports to CRS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Who is required to be in the “At the Controls” area at ALL times during any reactivity manipulations?

A

Reactivity Manager or CRS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the definition of “Low Power Operation”?

A

Reactor Power < or Equal to 20%

17
Q

The RO/CO initiates a load reduction if conditions indicate a load reduction is necessary to prevent ___

A

…a Unit trip or exceeding Limits

18
Q

The shift manning sheet designates individuals responsible for operation of the Unit. All other personnel (engineering, maintenance, managers, etc) supporting the operating staff are considered ___

A

…Control Room Advisors

  • Recommendations, Advise or other info that can impact operating decisions
19
Q

Control Room Advisors normally communicate directly with ___

A

…the Shift Manager ONLY