Stark Engineering Flashcards
Stark
What is a sector EO authorized to do to ensure timely completion of all scheduled or unscheduled maintenance activities for any sector asset?
Who else can?
Classify an asset as NMCM
The OIC
Stark
When is an engineering waiver needed?
Who has final authority to grant an engineering waiver?
To get permission to operate an asset with a disabling discrepancy or to operate equipment overdue on scheduled maintenance
The operational commander grants the waiver after product line approves the request
Stark
When granted, how is an engineering waiver documented
In EAL: sign off the restrictive or disabling discrepancy stating; “Waived for operational use IAW PL approval (DTG) and OPCON approval (DTG)”
Create new discrepancy stating original discrepancy and restrictions/limitations
Status asset PMC and record applicable waiver comments
Stark
What is the difference between an engineering waiver and a safe to sail waiver?
An engineering waiver is routed to Product Line for approval to operate equipment outside normal parameters or overdue on scheduled maintenance
A STS waiver is requested by the unit OIC to OPCON to get underway or stay underway with anything less than the published STS critical equipment list
Stark
65 safe to sail items?
MDE: 1 SSDG: 1 Red gear/shaft/prop: 1 Steering system: 1 GPS: 1 ENav Gyro: 1 Radar: 1 Fathometer: 1 Lights and whistle Anchor/windlass: 1 VHF: 2 1MC Interior comms (not 1MC) MSFD fire suppression Fire pumps: 1 P100 P/W system Sewerage system Cutter boat / handling Life rafts Epirbs
Stark
87 safe to sail items
MDE: 2 SSDG: 2 Red gear/shaft/prop: 2 Steering system/pump: 2 GPS Enav Gyro Radar Fathometer Lights/whistle Anchor/windlass VHF: 2 1MC Interior comms Fire suppression system Fire pump P100 P/W system Sewage system Cutter boat/handling Life rafts Epirb
Stark
What does a priority two parts request, form CG-4491 require?
A disabling maintenance record entered in ALMIS/EAL
Stark
What are pink sheets used for in Almis
To document mission related discrepancies
Stark
Is a pink sheet required even if the rare no discrepancies
Yes. NTE - Nothing To Report
Stark
What are white sheets used for in Almis
To document discrepancies that are not mission related
Stark
Can a white sheet be used to document mission-related discrepancies
Yes. When waiting for mission close out would cause an unreasonable delay
Stark
How long can a discrepancy be open in Almis until it’s status has to be deferred? Are there exceptions?
24 hours
Yes, disabling discrepancies remain open
Stark
If not a disabling discrepancy, what are open discrepancies deferred to?
PP: Parts Pending
CF: Carried Forward
CFD: Carried Forward Depot
Stark
What is required for maintenance records deferred as parts pending?
A document or purchase request number
Stark
What are all the asset status types?
FMC: Fully Mission Capable PMC: Partially Mission Capable NMCM: Not Mission Capable Maintenance NMCS: Supply NMCD: Depot NMCL: Lay-up
Stark
If an asset is listed as NMCM, NMCS,or PMC what must be included in the asset status remarks
At least one maintenance discrepancy that describes what work, parts, etc are required to return the asset to FMC
Stark
What three conditions must exist to list an asset status as NMCS
NMC because parts are needed
No progress can be made until parts are received
No other required maintenance needs to be done to restore asset status