Engineering Flashcards

1
Q

OIC EAL roles and responsibilities

A

1) Approve, lock, unlock, edit mission records
2) Add/edit mission schedules and records
3) Add/edit all other areas of operations and mission operations
4) Add/edit operational and asset status
5) Add/edit training records for personnel
6) Accountable for the accuracy and completeness of units EAL entries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

87 bravo fire steps

A
Set the box
P100 online
Mechanical/electrical isolation
Muster
Energize CO2
Observe smoke change
AFFF bilge dump (3 cans for vapor seal)
Re-enter
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How many SCBAs on an 87?

A

15 total

5 in forward DC(deck) locker
10 in lazarette

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Environmental emergency oil/hazardous substance notifications

A

U.S., Canada, or Mexico: NRC

Other: nearest country

Puerto Rico, Panama Canal Zone, U.S VI: RNC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the three sections of the unit environmental guide?

A

1) In port vessel operations and maintenance
2) Vessel operations at sea
3) Spill prevention and incident response

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who is accountable for oil spill prevention?

A

OIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Conditionally exempt small quantity generators (CESQG) can dispose how much haz waste monthly?

A

Less than 100 kgs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

For ashore, what is the first step regarding environmental compliance?

A

Locate/review most recent environmental compliance

Correct outstanding findings

Request assistance from LC/CEU if needed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How often should environmental compliance evaluations be completed

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

In drydocking, what are constructive changes?

A

Implied change or an unauthorized contract modification made during a repair availability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Who can authorize a contract modification at dry dock?

A

Product line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Prior to drydocking, the OIC is responsible for what?

A

Block arrangement is IAW the docking plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Before drydocking, what brief must the crew receive?

A

Industrial safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the underwater body inspection board? Form? Paint report?

A

Board: OIC, EPO, 1st LT, Product Line

Form: 2926

Paint Report: 4815

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

OIC drydocking responsibilities

A

1) Blocks arranges IAW docking plan
2) Shift operational control of ship to dock master IAW NSTM 997
3) While docked, ensure no shifting of weight, fuel, water, or ballast without permission from dockmaster
4) Keep an accurate count of all changes and shifts in weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the Casrep reporting timeline?

A

In 24 hours if not able to corrected within 48 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What casrep message is used for mistakes?

A

CASREP(update)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Who is responsible for establishing a comprehensive GFE program

A

OIC

19
Q

What is IDLH?

A

Immediately dangerous to life or health

Fuel tanks, chemical tanks, sewage system tanks etc

20
Q

Who is responsible for the maintenance and updating of the ECCM

A

EPO

21
Q

What are the chapters to the ECCM for a WPB? WYTL?

A

1) Machinery readiness (RMD)
2) Becces
3) GE
4) DC organization (MSFD)

Black hulls; 1,2,4 only

22
Q

What are the five main safety instructions

A

Respiratory protection

Safety and environmental health manual

Cutter heat stress program

Hazardous communication for workplace materials

RM

23
Q

Where should the ECCM be kept?

A

Main control

Engineering assist location

Repair lockers

DCC

Pilot house

24
Q

What is the RMD

A

A written agreement between the OIC and EPO regarding levels of casualty control taken during specific evolutions

25
Q

What are the four basic stability terms? Top to bottom

A
Metacenter
              ¥
Center of gravity
              ¥
Center of buoyancy
              ¥
           Keel
26
Q

Excessive weight and the free surface effect will cause the center of gravity to move how?

A

Towards the weight

27
Q

In the drydocking pre-arrival conference agenda, what are the 3 OIC responsibilities

A

Identify a safety officer and fire watch coordinator

Safety preparedness

Hazardous materials and waste handling plan

28
Q

What plan is required if the unit stores more than 660 gallons of petroleum in an above ground tank OR 1320 gallons total above ground OR 42,000 gallons below ground?

A

Spill prevention control and countermeasures

29
Q

For hazardous energy control the OIC appoints who?

A

Authorizing Officer, who establishes and manages the program

Typically the EPO

30
Q

OIC is responsible for what, in regards to hazardous energy control?

A

Comprehensive tag out and lock out program

31
Q

What is USAT? How often is it completed?

A

Unit Safety Assessment Tool

Annually

32
Q

What are the free available chlorine and bromine ranges

A

Chlorine: 0.2 ppm
Bromine: 6.8-7.8

33
Q

How are environmental compliance discrepancies tracked?

A

CP-Track

As directed by DHS

34
Q

Who is responsible for environmental stewardship

A

OIC

35
Q

What is SAM?

A

Shore asset maintenance

Tracks work orders

36
Q

What manuals outline the EPOs responsibilities

A

Coast guard regs

NEM

37
Q

Can the OIC approve/sign QA inspection letters?

A

No. QA designation authority is at Sector EO

OIC can endorse only

38
Q

What are the EPO tool control program responsibilities

A

Report tool defects or discrepancies to Sector EO

Maintain a tool control logbook for each toolbox

Report list tools and compliance to EO and MCO

39
Q

What is a CG22 feedback form be used for?

A

Request changes to documentation for CG surface asssets

Recommending changes in processes, procedures, or materials

40
Q

What level are CG22 feedback forms typically generated at?

A

Unit

41
Q

What four maintenance activities require maintenance release authority

A

Corrective action for a disabling casualty

Defer maintenance, carry forward, carry forward depot, carry forward parts pending

Engineering waiver

Deviations from asset MRC

42
Q

Who can be an alternate maintenance release authority

A

Maintenance control officer

43
Q

OIC responsibility with bi-level maintenance?

A

Ensure equipment is made available for maintenance when the resource is available

44
Q

What are the EPOs responsibilities

A

Manage maintenance

Support maintenance

Authorized to classify assets

Review/approve MPCs

MPC cover sheets submitted to centralized maintenance manager (CMM) within 24 hours of completion