SFTRM Flashcards
What are the Critical Mission Areas (CMAs)?
3M AT EXPSAF Cyber FSO-M Supply MOB-D
What are the 6 rolling warfare areas?
3M AT EXPSAF FSO-M SAR SUP
What happens if you notice that the Ordnance DRRS-N PESTO pillar goes yellow but we have our full ship’s Operational Alloowance onboard?
CO must make a comment in the unit assessment portion of DRRS-R to account for the difference between the NAVSEA 30,000 series allowance and the Operational Allowance
When is the CO required to give a Ready for Basic Phase brief to TYCOM? What’s included in this brief?
45 days prior to FTA 1
Personnel and training shortfalls
Material issues
Training system issues
Issues that might impact Basic Phase training
What is the CO required to brief (and to what audience) during the basic phase, and when should this brief occur?
NLT Week 12 of Basic Phase
Status of all certifications and plan of action for unobtained warfare areas
How often is the CO required to review the ship’s training plans and Res?
Monthly
During which READ-E events is TYCOM supposed to review the Command Training Plan?
READ-E3 and READ-E5
What 4 minimum requirements must be included in the Command Training Program?
Formal schools
WTRP
PQS
CTP
What must the CO complete as soon as they reach the 90-day-in-Command mark?
Email TYCOM a report detailing the CO’s assessment of the ship’s readiness WRT manning, training, equipping and material readiness.
What is a “Mitigation Plan”?
A plan submitted to detail a POAM for any failed:
- Certification Event
- READ E4
- Any TORIS FOM drops below 60% when in the sustainment phase
Can Interim-Qualified personnel be on the Master Qualifier List?
No.
Who determines what level of re-qualification should occur with PGs?
Whoever has the Full Qualification Authority
What training teams are required to be onboard?
STT ATT CSTT ITT DCTT ETT MTT VBSTT
What 6 instructions must be signed by the CO within the first 90 days of command?
STAND B
S Standing Orders T Temporary Standing Orders A Antiterrorism N Navigation Bill D Damaged Equipment Bill
B Battle Orders
What is FST-U?
Unit-level, ATG-driven event that pushes a ship through its final Certification Exercises in various warfare areas (AW, SW, etc.)
What warfare areas are exercised during FST-U?
AW CRY EW INT SW STW (Not certified during FST-U) ASW (Not certified during FST-U)
How often does ATG report MITE participation to SURFOR?
Quarterly
List 5 warfare areas performed during MITE.
Comms CRY AW EW MIW USW GCCS
When are ships exempt from participating in MITE?
Maintenance / Basic
If your ship cannot operationally participate in a MITE, what should happen?
Ship flies a MITE excusal request
CO discusses with ISIC (DH discusses with N Head)
What’s the manning requirement for critical NECs for each phase of the OFRP?
IAW the DRRS-R threshold
For each mission are, what percentage of critical NEC schools must be scheduled to exit any phase of the FRTP?
100%
Can you send a Sailor to a critical school if he/she does not meet all of the pre-requisites?
Yes, but TRAINO must send out a Prerequisite Waiver Request through the ISIC
Can your ship go on deployment with a PG scheduled for a school to assist in Billet Specialty Training for her/his assigned billet (aka the Sailor skips the BST)?
Yeah, but a waiver must be submitted by TRAINO. BST would only be delayed, not cancelled.
During what phase will you execute a Availability Concurrent TSRA?
Maintenance phase
When should you expect the Post-Availability TSRA to occur?
Shakedown Phase
During what phase should you expect the Pre-Deployment TSRA?
Integrated phase
When should you expect the Pre-Availability TSRA to occur?
The middle of the Sustainment phase
When does READ E4 occur?
Final month of the maintenance phase
When does READ E5 occur?
Shakedown phase / sea trials
When does READ E6 occur?
Basic Phase, halfway through
When does READ E7 occur?
Integrated Phase
When does READ E1 occur?
Sustainment, just after deployment
When do READ E2 and E3 occur?
½ way through the sustainment phase — when approaching the maintenance phase
When does the AWP:
- Planning start?
- 50% Lock?
- 80% Lock?
- WPIC?
Planning Start of the Sustainment Phase
50% ½ through sustainment
80% ¾ through sustainment
Lock 6-8 months before the Maintenance Phase
What is FTA?
Focusted Training Availability. A time for ships to focus on unit-level training.
How many times can a ship utilize a Certification Validation?
Only once for a warfare area.
If your ship will be executing a CV in the future, what must you scheduled prior to the CV event?
ATG LTT
What 5 events constitute the READ E4?
MRG Health Assessment KTR Trials Crew Cert Dock Trials/Fast Cruise Nav Check Ride
What is the point of Dock Trials?
It validates the engineering plants readiness for operations prior to executing KTR Sea Trials.
List 3 times your ship must execute Fast Cruise.
- Any inport period of 60+ days
- Any CMAV > 4 weeks
- After any CNO Availability