What are the Critical Mission Areas (CMAs)?

A
3M
AT
EXPSAF
Cyber
FSO-M
Supply
MOB-D
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the 6 rolling warfare areas?

A
3M 
AT
EXPSAF
FSO-M
SAR
SUP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What happens if you notice that the Ordnance DRRS-N PESTO pillar goes yellow but we have our full ship’s Operational Alloowance onboard?

A

CO must make a comment in the unit assessment portion of DRRS-R to account for the difference between the NAVSEA 30,000 series allowance and the Operational Allowance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When is the CO required to give a Ready for Basic Phase brief to TYCOM? What’s included in this brief?

A

45 days prior to FTA 1

Personnel and training shortfalls
Material issues
Training system issues
Issues that might impact Basic Phase training

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the CO required to brief (and to what audience) during the basic phase, and when should this brief occur?

A

NLT Week 12 of Basic Phase

Status of all certifications and plan of action for unobtained warfare areas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How often is the CO required to review the ship’s training plans and Res?

A

Monthly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During which READ-E events is TYCOM supposed to review the Command Training Plan?

A

READ-E3 and READ-E5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What 4 minimum requirements must be included in the Command Training Program?

A

Formal schools
WTRP
PQS
CTP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What must the CO complete as soon as they reach the 90-day-in-Command mark?

A

Email TYCOM a report detailing the CO’s assessment of the ship’s readiness WRT manning, training, equipping and material readiness.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is a “Mitigation Plan”?

A

A plan submitted to detail a POAM for any failed:

  • Certification Event
  • READ E4
  • Any TORIS FOM drops below 60% when in the sustainment phase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Can Interim-Qualified personnel be on the Master Qualifier List?

A

No.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who determines what level of re-qualification should occur with PGs?

A

Whoever has the Full Qualification Authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What training teams are required to be onboard?

A
STT
ATT
CSTT
ITT
DCTT
ETT
MTT
VBSTT
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What 6 instructions must be signed by the CO within the first 90 days of command?

A

STAND B

S	Standing Orders
T	Temporary Standing Orders
A	Antiterrorism
N	Navigation Bill
D	Damaged Equipment Bill

B Battle Orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is FST-U?

A

Unit-level, ATG-driven event that pushes a ship through its final Certification Exercises in various warfare areas (AW, SW, etc.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What warfare areas are exercised during FST-U?

A
AW
CRY
EW
INT
SW
STW (Not certified during FST-U)
ASW (Not certified during FST-U)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

How often does ATG report MITE participation to SURFOR?

A

Quarterly

18
Q

List 5 warfare areas performed during MITE.

A
Comms
CRY
AW
EW
MIW
USW
GCCS
19
Q

When are ships exempt from participating in MITE?

A

Maintenance / Basic

20
Q

If your ship cannot operationally participate in a MITE, what should happen?

A

Ship flies a MITE excusal request

CO discusses with ISIC (DH discusses with N Head)

21
Q

What’s the manning requirement for critical NECs for each phase of the OFRP?

A

IAW the DRRS-R threshold

22
Q

For each mission are, what percentage of critical NEC schools must be scheduled to exit any phase of the FRTP?

A

100%

23
Q

Can you send a Sailor to a critical school if he/she does not meet all of the pre-requisites?

A

Yes, but TRAINO must send out a Prerequisite Waiver Request through the ISIC

24
Q

Can your ship go on deployment with a PG scheduled for a school to assist in Billet Specialty Training for her/his assigned billet (aka the Sailor skips the BST)?

A

Yeah, but a waiver must be submitted by TRAINO. BST would only be delayed, not cancelled.

25
Q

During what phase will you execute a Availability Concurrent TSRA?

A

Maintenance phase

26
Q

When should you expect the Post-Availability TSRA to occur?

A

Shakedown Phase

27
Q

During what phase should you expect the Pre-Deployment TSRA?

A

Integrated phase

28
Q

When should you expect the Pre-Availability TSRA to occur?

A

The middle of the Sustainment phase

29
Q

When does READ E4 occur?

A

Final month of the maintenance phase

30
Q

When does READ E5 occur?

A

Shakedown phase / sea trials

31
Q

When does READ E6 occur?

A

Basic Phase, halfway through

32
Q

When does READ E7 occur?

A

Integrated Phase

33
Q

When does READ E1 occur?

A

Sustainment, just after deployment

34
Q

When do READ E2 and E3 occur?

A

½ way through the sustainment phase — when approaching the maintenance phase

35
Q

When does the AWP:

  • Planning start?
  • 50% Lock?
  • 80% Lock?
  • WPIC?
A

Planning Start of the Sustainment Phase
50% ½ through sustainment
80% ¾ through sustainment
Lock 6-8 months before the Maintenance Phase

36
Q

What is FTA?

A

Focusted Training Availability. A time for ships to focus on unit-level training.

37
Q

How many times can a ship utilize a Certification Validation?

A

Only once for a warfare area.

38
Q

If your ship will be executing a CV in the future, what must you scheduled prior to the CV event?

A

ATG LTT

39
Q

What 5 events constitute the READ E4?

A
MRG Health Assessment
KTR Trials
Crew Cert
Dock Trials/Fast Cruise
Nav Check Ride
40
Q

What is the point of Dock Trials?

A

It validates the engineering plants readiness for operations prior to executing KTR Sea Trials.

41
Q

List 3 times your ship must execute Fast Cruise.

A
  • Any inport period of 60+ days
  • Any CMAV > 4 weeks
  • After any CNO Availability