Safety Officer Flashcards
What size are members for heavy timber
Greater than 8 inches in dimension with resistance rating of 2 hours, very few or no concealed spaces
Who does the responder rehabilitation manager report to
Medical unit leader in the logistics section of the ICS structure
Fire personnel should assess incidents for what 4 things when establishing the ICS
Cause
Needs
Size
Complexity
Winds as slow as ____ can be deadly if personnel are not alert to the rapidly changing conditions
10mph
Light white smoke means
Pyrolisis is occurring, moisture and gases are being released from the product
All incidents should have a _______
IAP
What are 3 command staff positions
Safety Officer
Liaison Officer
Public Information Officer
Flashover typically occurs around ______ degrees
1100 degrees F
NFPA 1952 calls for water rescue personnel to wear at least
Type 5 vest with minimum 22 pounds of buoyancy
Document that may be used to track units and record field notes, evolves into written IAP if incident escalates in size or complexity
Tactical Worksheet
What is the last line of defense against injuries, fatalities, illnesses and exposures
ISO
Mid-neutral smoke plane means
Approaching flashover, not ventilated
Form of energy transferred from one body to another as a result of a temperature difference
Heat
Two forms of rehab:
Rest and medical
Smallpox and Ebola are
Viral biological agents
What gives smoke its white color
Moisture and heated gases
Type 3 construction
Ordinary construction
Priority number one
Safety
What are the two branches of logistics
Support and service
Natural gas is odorless gas that is ______ than air
Lighter
The darker and more turbulent the smoke is:
The closer you are to a rapid fire event
Rapid transition from the growth stage to the fully developed stage
Flashover
Type 5 construction is
Wood frame construction
Rapidly increasing volume, turbulence, darkening in color and lowering of the hot gas level for smoke means
Flashover soon
All other factors being qual, a fire in a large compartment will develop faster or slower than one in a small compartment
Slower
Gathering of information from all personnel that were involved to help process the scope of the incident, usually within a few days of the incident
Debriefing
Retro reflective trim must extend across how much of a vehicle
25 percent of the front, 50 percent of the sides and rear
Instantaneous explosion or rapid burning of superheated gases that occurs when oxygen is introduced into an oxygen depleted confined space during the decay stage
Backdraft
Sarin and VX are
Nerve agents
Ricin is
Toxin biological agent
What are the general staff positions for large incidents
Planning
Operations
Logistics
Finance/Administration
The goal of an operation is for
Incident stabilization
Stabilization of objects that are in danger of collapse
Shoring
Smoke that floats out of openings, rising slowly
Volume-pushed smoke
Anthrax, cholera, the plague are what
Bacteria Biological agents
Treat solar power systems and panels as ____ fires
Class C
Type 4 construction
Heavy timber
Rescues within a traffic scene should be within
The work safety zone
Primary considerations in developing the IAP are
Incident priorities
Risk/benefit analysis
What should be the first delegated position within the command and general staff positions
ISO
Informal discussion with responders conducted the same day as the critical incident and before members are relieved of duty
Defusing
What do businesses creat to identify their potential hazards and risks to employees and the public, and to identify the control measures implemented to mitigate them
Site safety plan
What is the most common method used for risk reduction
Adoption of effective control measures
Total amount of heat produced or released during convective lift phase of a fire
Heat Release Rate (HRR)
Development of an incipient fire is largely dependent on
The characteristics and configuration of the fuel involved
Phoenix and Seattle FD found that a RIC Rescue needs an average of how many FFers to retrieve a downed FF and how long
Average of 11 and up to 20 minutes
Wooden structural panel formed by gluing and compressing wood strands together under pressure
Oriented stand board (OSB)
Structural members created from several layers of plywood or oriented strand board
Laminate beams