Procedures Flashcards
Prelim pre-flight
Log & Docs- E1, E2, E3, E5, QRHx2Flight deck access panelSafety equipment- FFFSSSCLE5 Gear pinsSide panelCircuit breakersEmergency Signal & Cabin int
Safety equip in prelim preflight
S-moke hoodS-moke gogglesS-ignal equipmentF-ire extinguisher F-ire gloveF-lashlightC-rash axeL-ife jacketE-scape rope
Before Start procedure
5min call- Req ClceOnce clearance - THUMBS UPRoute page;- Clearance check- Destination- Departure, transition, FLT planned route SQ, SET SQLEGS PAGE - No alt constraint MCP ALT SET, INITIAL HDG SET, REQ WT & BALHYDRAULICS!!!Weight insertion - Perf init page- ZFW, FOB, GWTTake off Ref- COGStab Trim”Open handy SPD book”GWT, F5, TO2, DRY RWYSet SPDS CDU?Read SPD’sV1, VR, V2- MCP SPD ___SET, LNAV ARM, VREF30 Is___ +40 bug set, +80 bug set.REVIEW- F5, TO2, BUGS SET, STAB &AILERON TRIM ZERO6R on T/O page- PRE FLT COMPLETE”Before Start Checklist”Taxi &take off briefing
In the Prelim preflight what happens after the EMER signal & cabin INT check?
CREW BRIEFING
What happens after CREW BRIEFING?
CAPT REQ WEATHER AND CHECKS ALTIMETERS FOR RVSM
PM- “CDU SETUP COMPLETE”
RTE CHECKPM READS FROM BOX TILL AFTER DEP THEN FROM FLT PLAN. RTE 1, RTE 2, PERF- ALTPF CHECKS FROM BOX
What happens following RTE check?
FO PRE flight scan
“PM IS READY”
PRE flight checklist
“5MIN”
AIRWAYS CLCEPF RDS RTE1, RTE2, PERF-ALT, SQ. “SET SQ”, “SQSET”LEGS- “NO ALT CONSTRAINT, MCP ALT SET FL, INITIAL HDG SET___”, REQ WT & BALANCE”
What happens after PM receives WT & BALANCE?
“GND COCKPIT REQ PRESSURIZE HYDRAULICS”HYD PUMP ON
What happens after HYD pump on?
PERF INIT PG, PM SET ZFW, FOB, GWT, TAKE OFF PG- COG, PF SET STABOPEN HANDY SPD BOOK- GWT, F5, TO2, DRY RWYSET V SPDS IN BOXREAD OUT, SET MCP AND ARM LNAV
After the last bug set is read out what happens?
TO REVIEW- F5, TO2, BUGS SET, STAB, RUD & AILERON TRIM ZERO.6R- “PRE FLT COMPLETE” BEFORE START C’LIST”
What is grouped with “PREFLIGHT COMPLETE”?
“BEFORE START CLIST”
“BEFORE START CLIST COMPLETE TO THE LINE”
Taxi and TO brief
“ALL DOOR CLOSED”
PF- “Weight is checked, clearance is received, Cabin is OK” “REQ PUSHBACK”PM- HYD PUMPS ON, FUEL PUMPS ON, Red anti. Coll after pushback CLCE
Push back clearance received?
“RECALL” CANCEL MESSAGE”“CONTINUE CHECKLIST”
“BEFORE START CHECKLIST COMPLETE”
“GND TO COCKPIT, PUSHBACK RWY 18”
Cabin is secure signal
3 C’S!!!!”CABIN IS SECURE” CLB PG PM- LEGS PG”CONTACT TOWER READY”
“Cleared for Takeoff”
“Cleared for takeoff, notify Cabin” PM- 4 chimes of seat belt selector”Continue Checklist”
LINING UP
PM- Transponder, WX radar, White anti colPF, WX radar. “RWY is clear”PM- “Approach side is clear, RWY 18, (Entry point)”PF- HDG 182, RWY is CLEAR”70%, STABILIZED, N1”
Target Airspeed in CLB
V2+15 to V2+25