Operate Electrical System Flashcards

1
Q

What are minimum voltage for Batt 1 and Batt 2 during the safety and power-up checklist?

A

-22.5 V
-between 21 and 22.5 perform recharging procedure
-below 21 call maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Understand AC Power Priority (Onside, Inside, Outside, Cross-side)

A

Because there is a potential for 4 AC power sources during normal operations, the term “Power Priority” is used to discuss the order, or ranking, that AC Bus 1 and AC Bus 2 use when selecting a source of power.

Both AC Bus 1 and AC Bus 2 determine their own source independently.

Source priority for powering AC Bus 1 and AC Bus 2 is:
1. Respective IDG. (“Onside”)
2. APU generator. (“Inside”)
3. AC GPU. (“Outside”)
4. Opposite IDG. (“Cross-side”)

IDG= Integrated Driven Generator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are two main components on the DC HOT BAT BUS 1 and 2 that we, as pilots, care about?

A

Engine 1 and 2 Fire Extinguishing and Panel Refuel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What type(s) of circuit breakers does the E175 have? How do I access them?

A

There are thermal and electronic circuit breakers

Some thermal CBs are located in the cockpit on cockpit sidewall panels, non-remote, visually checked by crew. Others, remote, are in the electronic bays (ICCs) and must be checked through the MCDU.

Electronic CBs are located in the electronics bays (SPDAs) and are considered remote CBs. These must be checked in the MCDU.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Briefly explain the purpose of the RAT

A

Supplies AC power in emergencies

The Ram Air Turbine (RAT) is an AC electrical device installed in the airplane nose section, which converts the kinetic energy of airflow across the turbine into AC power.

In case of total AC power loss in flight, the RAT should automatically deploy and provide AC power for systems essential to the safe operation of the aircraft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What EICAS message would indicate the RAT has NOT deployed during an electrical emergency?

A

Batt Discharge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What AC Busses are energized during an electrical emergency before the RAT deploys? After the RAT deploys?

A

STBY AC bus
* DC essential bus

AC essential bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What items are on the AC STBY BUS?

A

Engine 1 Exciter 1A
Engine 2 Exciter 2A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What items are on the AC ESS BUS?

A

AC Fuel Pump 2A
ACMP 3A
SF-ACE 1 Flap CH 1 AC Feed
SF-ACE 2 Slat CH 2 AC Feed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What purpose does an Inverter serve?

A

The static inverter (AC/DC inverter) converts 28 V DC power from batteries to 115 V AC power to supply the STANDBY AC BUS when an AC power source is not available

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What purposes does a Transformer Rectifier Unit (TRU) serve?

A

TRUs convert AC power into DC power.

Each TRU works in isolation. If one fails, the DC Busses will be powered by the remaining TRUs (as long as the DC BUS TIES toggle switch is selected to AUTO).

Three TRUs convert 115 VAC power into VDC.

TRU 1 provides DC power to DC Bus 1, DC ESS BUS 1, DC GND SVC BUS, HOT BATT BUS 1 and battery #1 charging.

TRU 2 provides DC power to DC BUS 2, DC ESS BUS 2, HOT BATT BUS 2 and battery #2 charging.

TRU ESS provides DC powr to DC ESS BUS 3.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the difference between OFF and DISC on either IDG Selector?

A

Auto: allows automatic operation of the electrical system

OFF: opens the IDG contactor isolating the IDG from the respective AC Bus to trip the IDG offline

DISC: Must be held in this position for one second to mechanically disconnect the IDG. Mechanically disconnect the IDG (must be held in this position for at least 1 but no more than 3 seconds). A reset by maintenance is required for a mechanical disconnect of an IDG.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What, operationally, is powered even while the batteries are off?

A

Hot Battery Buses are always powered, regardless of battery switch position. Fueling panel is on the hot bus which allows fueling and defueling even while the airplane is powered down.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What will cause the RAT to deploy automatically? What speed is needed to ensure the RAT continues to provide electrical power?

A

Whenever AC power sources are not powering the AC buses in flight, the RAT is automatically deployed and after 8 seconds, supplies power to the AC ESS BUS.

Minimum 150 KIAS to get the RAT spinning
Minimum 130 KIAS to keep RAT spinning
RAT stays attached to AC ESS BUS - even if we get normal AC power re-established
Flaps 3 landing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly