Lot Listing Flashcards

1
Q

What is a Lot listing?

A

Choosing he must suitable house for given lot using- Economics, marketability, and appearance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is the importance of an accurate Lot Listing?

A

sets restrictions on what we can,can’t build on the lots.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What side of the lot should an attached or contiguous garage be located?

A

HIGH SIDE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What side of the lot should an integral garage be located?

A

LOW SIDE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what are the different foundations in your market?

A

Slab to grade, basement, WO, inground.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How do you differentiate between existing and proposed grade on a Site Plan or Engineer Plan?

A
              • Existing ______ proposed final grade
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Lock level

A

Used to create reference points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Hung Sewer

A

Sewer system that forces gravity up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Product offering

A

P.O. house offering on lot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Below-grade block

A

dirt on one side

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Sub-grade block

A

below slab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Retaining wall

A

wall that is meant to hold steep grade

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Integral Garage

A

Garage located below house (low side)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How does a Lot Listing tie into the Area Figure concept?

A

lot listings can minimizes Area Figures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

who should usually be involved in conducting Lot Listings?

A
  1. Divisional Manager
  2. Production Manager
  3. Cost manager
  4. Sales manager
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

List three materials needed to perform a Lot Listing?

A
P.O. 
Builders level 
land contract 
site plan 
blank lot listing