Drywall Flashcards

1
Q

How many days does it take to finish drywall from hanging to sanding?

A

5-8 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is 1/2” drywall used for?

A

interior walls and ceilings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

where is 5/8” fire-shield used?

A

garages adjacent to living areas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

where is cement board used?

A

in bathrooms where ceramic tile we be installed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Corner beading

A

Material used when two pieces of drywall meet at a corner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Compound

A

material that is skimmed over the tape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Ultra flex 450

A

tape used at drywall ceilings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Durabond

A

mud used for drywall repairs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If drywall board becomes saturated, is it usable?

A

NO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Drywall is beveled on the edges for what purpose?

A

horizontal joint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is the drywall warranty to our customer?

A

1 year and 10 month

-fix settlement issues with corner bead, caulking at stairs, cracks that exceed 1/8” nail pops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What position must drywall be hung?

A

Horizontally

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

what minimum temperature is needed to hang drywall?

A

40 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what mimimum temperature is needed to finish drywall?

A

55 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

what is the typical nail and screw fastening pattern for drywall?

A

8’ O.C.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

On the NVR Braced wall blueprints, what does the note GB-2 indicate?

A

Gypsum board on both sides

17
Q

How many coats of finishing comping are to be applied per NVR phase Spec?

A

3

18
Q

when should we schedule the drywall point-up and checkouts?

A

After trim and Final trades, before second paint

19
Q

What is the procedure for stocking drywall into a basement?

A
  1. Framer is to cut in-between two floor joist.
  2. framer screws OSB opening to floor system
  3. Stock crew unscrews OSB to stock
  4. Framer glues and screws OSB opening to floor once stock is complete
20
Q

List 3 safety violations that you may encounter during the drywall phase.

A
  1. heater directly on OSB sub floor
  2. heater gas hose is in a door opening
  3. no one on crew can speak english
  4. in-proper scaffling
21
Q

List 2 E&S violations that you may encounter in the drywall phase?

A
  1. placing drywall compound in yard

2. leaving drywall scrapes in yard