Backfill & Final Grade Flashcards

1
Q

What phases should be completed before backfilling for rough grade?

A
Sewer and water lines 
draintile 
waterproofing 
inspections
Footers and walls
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What establishes the final grade, and who is responsible for it?

A

the plot plan establishes final grade and the excavator is responsible for it

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How far below the bottom of the lowest framing member should the final grade be held at a minimum?

A

8” code requirement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What types of equipment are used to grade a typical lot?

A

loader, bobcat, and hauler

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When grading a home, how far away from the foundation should a piece of equipment stay?

A

away from the over dig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a swale?

A

a swale is where designed grade is directing water to drain away form the house

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

when are walks and driveways cut?

A

during rough grade

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the purpose of a retaining wall?

A

retaining wall is used to support a steep drop in grade from having sediment and erosion problems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is a deadman?

A

Anchors retaining wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly