Health and Safety Flashcards
• You mentioned CDM 2015 being a key piece of legislation. What other legislation are you aware of.
Working at hights regulation 2005
Health and Safety at work act 1974
Control of substances hazardous to health regulations 2002
• When does a project become notifiable
When it exceeds 500 person days, over 30 days on site and over 20 workers working at the same time at any point on the project
• What is included on an F10 notice
Project start and end date, site address, who the PD is, description of project, the contact details of client and the details of the local authority
• Your New city road project, you talk about an operative working in an unsafe manner. When would it not be safe to stop them from working.
If it puts their life in immediate danger
• What are the CDM regulations 2015?
It is intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced.
• What is CSCS?
Construction Skills Certification Scheme – they provide proof that individuals that works on building sites have the necessary training and qualifications for the job they undertake on site.
• What is the RICS surveying safely guidance note?
Sets out basic, good practice principles for the management of health and safety for RICS-regulated firms and RICS members.
• What is PPE?
Personal protective equipment
• What do you do when you visit site?
Inform my manager that I will be attending site and the times I will be going and returning. Inform the site manager and once I get to site let the site manager know I have arrived. Check the site notice board and then put my PPE on and enter site with the site manager who shows me around.
• Can you name 2 changes that came into effect with the CDM 2015 Regs?
The role of CDM Coordinator has been removed and the regulations have a simplified structure using a more linear structure – follows the project life cycle more.
• When would you appoint a PD?
Stage 1 or Stage 0
• What is PD?
Overseeing the work of the design team and take control of the preconstruction phase
• What is a PCI document consists of?
Vital role in the tender documents. Provides the details for contractors on the projects what the client already has
• What is included in a PCI?
Site information, surveys, drawings, fire strategy
• Who are the key duty holders under CDM?
The client, principle designer and the principle contractor.