Engineering Operations, Admin, Records & Reports Flashcards
what are the two subdivisons of the Engineering Operational Sequencing System (EOSS)?
Engineering operating procedures (EOP), and Engineering operational casualty control (EOCC)
what is used by watchstanders to correctly identify casualties and properly control casualties?
engineering operational casualty control (EOCC) guidelines
what is the purpose of the EOSS?
to detail the sequential operational functions for the complete cycle of plant operations
what documents describe the knowledge and skills a trainee must have to perform certain duties?
PQS
what are the 4 major ections of the PQS?
fundamentals, systems, watchstanding, qualification cards
what PQS section is termed the 100 series?
Fundamentals
what PQS section is termed the 200 series?
systems
what PQS section is termed the 300 series?
watchstanding
what PQS section is termed the 400 series?
qualification cards
the sources from which rating exam questions are taken are listed in what publication?
bibliography for advancement and study, NAVEDTRA 10052 SERIES
what manual provides information about minimum requirements for advancement to each pay grade within each rating?
NAVPERS 18068 SERIES, manual of navy enlisted manpower and personnerl classifications and occupational standards
what catalog lists all current training manuals and courses?
list of training manuals and correspondence courses, NAVEDTRA 12061 SERIES
the onboard ships drawing and blueprints are listed in an index termed what?
ship drawing index (SDI)
the onboard ships drawing are identifed in the ship drawing index by what special marking?
an asterisk
drawings in the ship drawing index are listed in what order?
numerical
what is the primary objective of the 3-M system?
to provide a means of managing maintenance and maintenance support in a way to ensure maximum operating readiness
what 3-M system establishes preventive maintenance, reduces the need for major corrective maintenance, increases economy, and saves the cost of repairs?
PMS
what document contains a numerical listing of outstanding deficiencies for all work centers aboard ship?
current ships maintenance project (CSMP)
if a problem arises with a piece of equipment that cannot be repaired within 30 days, you must preparea deferred action using what form?
OPNAV Form 4790/2K
if the problem with a piece of machinery is beyond ships force repair capability what form must be filled out?
OPNAV Form 4790/2K
because of rapid changes in the 3-M system, you should refer to a current copy of what publication?
COMNAVAIRFORINST 4790.2
what log is used to record importantdaily events and data pertaining to the engineering department and the operation of the engineering plant?
engineering log
personnel casualties (injuries) that occur, while underway in the engineering plant are documented in what log?
engineering log
the original engineering log, is prepared using what instruments?
pencil or pen
the engineering log is a legal record that must be retained onboard for how long?
3 years
who signs the engineering log underway every watch?
eoow
how are corrections made to the engineering log?
a single line is drawn through the original entry so that it remains legible, then the correct entry is logged and then the required person initials the margin of the page
who reviews the engineering log daily?
engineering officer
who signs the engineering log monthly?
commanding officer
what document is used to record all orders received by the station in control of the throttles regarding a change in the movement of the propellers?
the engineer’s bell book
who specifies which engineering operating records will be maintained and prescribes the form to be used when no standard record forms are provided?
type commander
who approves and sings the engineroom/fireroom operating logs on a daily basis?
engineering officer
how long must the the engineroom/fireroom operating log be reatained onboard?
2 years
who prepares the daily liquid load plan?
oil king
pms schedules are categorized in what manner?
cycle, quarterly, weekly
what schedule displays the planned maintenance requirements to be performed between major overhauls of the ship?
cycle schedules
who signs and dates the PMS Cycle schedule?
engineering officer
what PMS schedule is a visual display of the work center’s PMS requirements to be performed during a specific 3-month period?
quarterly schedule
who signs and dates the PMS Quarterly schedule?
engineering officer
who updates the PMS Quarterly schedule weekly?
Division officer
how long are PMS Quarterly schedules kept on file?
1 year
what PMS schedule is a visual display of planned maintenance scheduled for accomplishment in a given work center during a specific week?
weekly schedule
who updates the pms weekly schedule daily?
work center supervisor
who signs the pms weekly schedule?
division officer
what form provides maintenance personnerl with the means to report discrepancies and problems with the PMS system?
PMS feedback report form 4790/7B
who recieves the green copy of the PMS feedback report 4790/7B, and files it?
originating work center
who recieves the blue copy of the PMS feedback report 4790/7B?
3-M coordinator
when is the current ships maintenance project (CSMP) verified and updated?
monthly
what document contains orders for the night, and engineering department standing orders issued by the engineering officer?
engineering officer’s night order book
all equipment operating logs are prepared with high-and-low limit set points printed on each reading. all out of limits readings must be handled in what manner?
circle the out of limits reading in red, and annotate the action taken in the remarks section
who has the overall responsibilty of the ships tag-out program?
CO
who authorizes a system or piece of equipment to be tagged out?
authorizing officer
if the system or equipment tagged is placed out of commission, the authorizing officer must get permission from whom, before tagging out?
engineering officer and CO
who normally fills out and signs the tag-out record sheet and prepares the tags?
petty officer in charge of the work
after the petty officer in charge of the work completes filling out the tags and record sheet who makes an independent check of the tag coverage?
second person
when does the second person independently verify proper tag placement, signs the tags, and initials the record sheet?
after all tags are attached
what are the two types of tags?
caution and danger
what tag is used as a precautionary measure to provide temporary special amplifying instructions or to indicate that unusual caution must be exercised to operate equipment?
caution tag
what is the color of a caution tag?
yellow
what tag is used to prohibit the operation of equipment that could jeopardize the dafety of personnel or endanger equipment?
danger tag
what is the color of the danger tag?
red
what labels are used to identify instruments that are out of calibration and may not work properly?
out of calibration labels
what color distinguishes an out of calibration label?
orange
red labels that are used to identify instruments that do not work properly becuase they are fective or isolated from the system are termed what?
out of commission labels
who authorizes out of calibration and out of commission labels?
authorizing labels
how often is the tag-out log audited?
every 2 weeks
what does the acronym APL stand for?
allowance parts lists
what does the acronym AEL stand for?
Allowance equipage lists