Electrical Systems Flashcards
Where is the ELEC power panel located?
Overhead Switch Panel
How are the main AC generators cooled and lubricated?
AFT XSMN Main Oil Lubrication System
The GCUs protect the AC system from what four conditions?
Over Voltage, Under Voltage, Under Frequency, Feeder Fault
Where are the No 1 and No 2 AUX PDPs located?
Left and Right side Cabin (Mid-Point)
How is the APU generator cooled?
Air Cooled
An indicator on the center instrument panel indicates when the battery voltage drops below _____ Vdc
20
What is the purpose of the AC bus-tie gang bars on each PDP?
Isolate respective system to prevent “bus-tie” from occurring to the other side
With the BATT switch in the OFF position, the battery supplies DC electrical power only to the _____ bus.
Battery Bus
The battery bus can be energized by what two sources of DC electrical power?
1 and #2 Transformer Rectifier
What is the order of priority for the DC electrical system from highest to lowest?
Transformer Rectifier, External DC Power, Battery
True or False? The BATT switch must be in the ON postion in order to recharge or maintain the charge of the battery.
True
What three DC buses are powered by the battery with the BATT switch in the ON position?
Batt Bus, Essential 1 and 2
If the APU is running or external AC power is connected, DC power is supplied by the helicopter _____.
Transformer Rectifier
What is the order of priority of power for the AC electrical system from highest to lowest?
Main AC Generator, APU Generator, External AC Power
What “system” allows either main generator to provide electrical power to both buses should a single generator fail or be taken off-line?
Bus-Tie System