E190 -Electrical Flashcards

1
Q

What happens if you set the BAT 1 switch to OFF ?

A

The battery is isolated from the airplane electrical system and only supplies power to HBB 1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When are the batteries on the electrical synoptic page indicated white ?

A

When the voltage is < 18 V.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The IDG’s and APU GEN are rated at:

A

115/200 V30/40 kVA400 Hz

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The RAT is rated at:

A

115/200 V15 kVA400 Hz

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The AC/DC inverter is rated at:

A

250 VA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The static inverter powers:It converts:

A

The AC STBY BUS from the DC ESS BUS 1, when an electrical AC source is not available. (normally the AC ESS BUS through AC BUS 2).28 V DC to 115 V AC power.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When does the RAT deploy ?

A

Whenever AC power is lost. After 8 sec, the AC ESS BUS (and other essential busses) are powered by the RAT.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Can the RAT be stowed back in flight ?

A

No.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

It takes 8sec for the RAT to power the AC ESS BUS.In the mean time, the AC STBY bus and DC ESS BUSSES are powered by:

A

The batteries.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Is ACMP 3B powered during an electrical emergency (RAT deployed) ?

A

No. Only ACMP 3A is powered by the RAT.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Does the RAT power all essential busses at ANY airspeed ?

A

No.
< 130 kts, the RAT only powers the AC ESS BUS, other busses (DC ESS BUSSES, AC STBY BUS) are powered by the batteries.
At an even lower speed, load shedding occurs until AC ESS BUS is no longer powered.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the “no break power transfer” ?

A

It allows momentarily paralleling of AC power sources to avoid short power interruptions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The two NiCd batteries are rated at:

A

22,8 V27 Ah

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If AC power is available, are the batteries constantly charged ?

A

Yes, including by the RAT !

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the minimum battery #2 temperature for an APU start ?

A

minus 20 deg celsius.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In an electrical emergency, how long can the batteries supply power ?

A

For at least 10 min.

17
Q

When is the BATT 1(2) OVERTEMP msg displayed ?

A

If battery temperature is > 70 deg celsius for at least 2 sec.

18
Q

A DC GPU voltage should be between:

A

24 V - 29 V DC power.

19
Q

Which busses are included in the AICC ?

A

HOT BAT BUS 2APU START BUS

20
Q

Which busses are included in the EICC ?

A

DC ESS BUS 1DC ESS BUS 3HOT BAT BUS 1AC ESS BUSAC STBY BUSThe DC ESS BUS 2 is NOT included !

21
Q

Which busses are included in the RICC ?

A

AC BUS 2DC BUS 2

DC ESS BUS 2

22
Q

Which busses are included in the LICC ?

A

AC BUS 1AC GSBDC GSBDC BUS 1

23
Q

In which ICC can you find the DC ESS BUS 2 ?

A

In the RICC (integrated control center).

24
Q

Each ICC contains:

A

CB’sLRU’s and LRM’sAC or DC busses.

25
Q

What is an SPDA ?

A

An electrical load management unit that receives power from the respective busses (integrated in the ICC’s). They contain electronic CB’s.So: ICC - BUSSES - SPDA - airplane systems.

26
Q

How many SPDA’s exist and where are they located ?

A

There are two SPDA’s.SPDA 1 is located in the fwd electronics bay.SPDA 2 is located in the center electronics bay.

27
Q

SPDA 1 is DC-powered by:

A

DC ESS BUS 1DC ESS BUS 2DC GSBDC BUS 1

28
Q

SPDA 2 is DC-powered by:

A

DC ESS BUS 1DC ESS BUS 2DC GSBDC BUS 2

29
Q

All electronic CB’s are found in:

A

SPDA 1 or 2.

30
Q

Thermal CB’s are found in:

A

Cockpit or ICC’s.

31
Q

What is the electrical source priority ?

A

IDGAPUGPUOpposite IDG.

32
Q

When the electrical load increases, the SPDA can command load shedding, by turning off:

A
  • galleys- right windshield heating
33
Q

Is it possible to reconnect the IDG after disconnection ?

A

No.