CSE - Category II - Programming/Design Flashcards
1
Q
Name four federal agencies that may be involved in the approval process for a wetlands project?
A
- U.S. Fish & Wildlife Services
- U.S. Army Corps of Engineers
- U.S. Environmental Protection Agency (EPA)
- National Resources Conservations Service
2
Q
Topographical conditions
A
- Grading
- Vehicular access
- Utilities access
- Site Features
- Bodies of water
- Views
3
Q
Hydrological conditions
A
- Water table
- Site drainage
- Movement of water through site
- Foundation design
4
Q
Geological Conditions
A
- Soil Types
- Foundation Types
5
Q
Soil Types
A
- Expansive / clay: low bearing capacity
- Bedrock: stable, high bearing
6
Q
Foundation Types
A
- Typical footings & stem walls (stable soils, bedrock)
- Mat foundations (expansive soil, high water table)
- Piles and grade beams (expansive soil, high water table)
7
Q
5 main Climatic Conditions
A
- Temperature
- Humidity
- rainfall
- Wind
- Snowfall