Conrete Poured Floors Flashcards
When a concrete floor is newly poured how far apart would the shoring studs be ?
4 ft apart
At a recently poured concrete floor in a bldg where would the lumber used for forms usually be stored ?
On a floor which is 2 floors below the one that was recently poured
How would FD members no if a recently poured concrete floor is sound or not?
By when the concrete was poured how many hours it had to cure
Who would be able to give FD members at a construction site where concrete floors are being done proper info about floors?
Construction engineer. Bldg superintendent. Concrete Forman
If you can’t determine when concrete floors were poured FD should assume they we’re poured when?
Sometime within the last 24 hours
It is required that every floor that is stripped of it’s supporting plywood forms and when there in there currying stage get reshored . This reshoring of ____ x____ stud placed every ____ ft will be found on at least ____ floors below the most recently poured floor.
4x4. 8x8