Chapter 23: Facility Design, Layout, and Organization Flashcards

1
Q

Members of professional committee

A
  • Contractor
  • Architect
  • Designers
  • Lawyers
  • People using the facility
  • Coach
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Phases of building a facility

A
  • Predesign phase
  • Design phase
  • Construction phase
  • Preoperation phase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Predesign Phase

A
  • First step
  • Needs analysis
  • Feasibility study
  • Master plan formation
  • Hire architect
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Needs Analysis

A
  • Designers and experts collaborate and determine the needs of the athletic program
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Feasibility Study

A
  • Analyze strengths, weaknesses, opportunities, and threats (SWOT analysis)
  • Goal of the study is to ensure the investment will yield a viable and sustainable return
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Master Plan

A
  • The general plan for all phases of the new facility

- Should include the building and construction plan, facility design, budget, and operational plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Design Phase

A
  • Second phase
  • Ideas come together for structure and design
  • Finalize design committee
  • Create blueprint
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Construction Phase

A
  • Beginning to the end of construction

- Usually the longest phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Preoperation Phase

A
  • The final steps before the facility can open
  • Finishing interior decor
  • Hiring staff
  • Create cleaning schedule
  • Create operation plan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Step 1 for modifying an existing facility

A
  • Form committee
  • Feasibility study
  • Needs analysis
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Step 2 for modifying an existing facility

A
  • Create operational plan
  • Remodel and/or upgrade
  • Finalize design and decorations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Step 3 for modifying an existing facility

A
  • Arrange equipment
  • Create employee duties and schedule
  • Hire/keep staff
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Questions facility designers should be able to answer

A
  • How many athletes will be using the facility?
  • What are the training goals for the athletes, coaches, and administration?
  • What are the demographics of the athletes?
  • What will the training experience of the athletes be?
  • How will the athletes be scheduled?
  • What equipment needs to be repaired or modified?
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Considerations for building the facility

A
  • Location
  • Supervision location
  • Access
  • Ceiling height
  • Flooring
  • Environmental factors
  • Electrical service
  • Mirrors
  • Hydration
  • Lockers
  • Phone
  • Rails or padding
  • Storage
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Considerations for arranging equipment

A
  • Equipment placement
  • Traffic flow
  • Stretching and warm-up area
  • Circuit training area
  • Free weights
  • Weightlifting area
  • Aerobic area
How well did you know this?
1
Not at all
2
3
4
5
Perfectly