Chapter 23-Facility Design, Layout, And Organization Flashcards

1
Q

WHat is the order of the four phases involved in designing a new strength and conditioning facility?
A. Pre design, construction, design
B. Pre design, design, construction, pre operation

A

B. Pre design, design, construction, pre operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

An operational plan should be created in which of the following phases?
A. Design phase
B. Construction phase
C. Pre design phase

A

C. Pre design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the recommended minimum distance between the floor and the bottom of mirrors on the walls?
A. 16 inches
B. 18 inches
C. 20 inches

A

C. 20 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

WHich of the following is not a key consideration when determining the space requirements of a college strength and conditioning facility?

A

of athletic teams desiring to use the facility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the minimum recommended space between the ends of racks to provide room for spotters?
A.1 foot
B. 2 feet
C. 3 feet

A

C. 3 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The ___ phase is the first step in building a new facility. It should consist of a Need analysis, feasible study, and master plan.

A

Predesign phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

___ is the step in which the designers and experts collaborate and determine the needs of the program

A

Needs analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The second part of the pre design phase. Should analyze strengths, weaknesses and opportunities. SWOT

A

Feasibility study

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The general plan for all phases of the new facility

A

Master plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Last step of the pre design phase is hiring an

A

Architect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The ___ phase of the second phase in the process of building a new facility

A

Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The period of time from the beginning of construction to the end. The longest phase of the process

A

Construction phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Consist of the final steps before the facility can open . Interior decor and hiring staff

A

Preoperation phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During the pre operation phase it is vital to create a plan that will make opening the facility easy, for example cleaning and maintenance duties.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

FOrm committee
FEasilibility study
Needs analysis

A

FIrst steps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Create operational plan
Remodel or upgrade
FInalize design and decorations

A

Second steps

17
Q

Arrange equipment
Create employee duties
Hire/keep staff

A

Third steps

18
Q

How many athletes will be using the facility?

A

Size and scheduling depends on this

19
Q

WHat are the training goals for the athletes coaches and administration?

A

Determines equipment chosen

20
Q

What are the demographics of the athletes?

A

Determines type of equipment

21
Q

What will the training experience of the athletes be?

A

Help with training plans

22
Q

How will the athletes be scheduled?

A

More difficult parts. Determines number of staff scheduled layout and design

23
Q

Ceiling height should be?

A

12-14 feet

24
Q

Flooring should include?

A

Turf- ground based movements
Rubber
Wood

25
Q

Lighting should be?

A

50-100 lumens, use natural light

Temp range 68-78 degrees

26
Q

Mirrors

A

Should be placed at least 6 inches from eqipment

27
Q

____ and __ are top priorities when one is deciding on placement of equipment in a facility.

A

Safety and function