Chapter 23-Facility Design, Layout, And Organization Flashcards
WHat is the order of the four phases involved in designing a new strength and conditioning facility?
A. Pre design, construction, design
B. Pre design, design, construction, pre operation
B. Pre design, design, construction, pre operation
An operational plan should be created in which of the following phases?
A. Design phase
B. Construction phase
C. Pre design phase
C. Pre design phase
What is the recommended minimum distance between the floor and the bottom of mirrors on the walls?
A. 16 inches
B. 18 inches
C. 20 inches
C. 20 inches
WHich of the following is not a key consideration when determining the space requirements of a college strength and conditioning facility?
of athletic teams desiring to use the facility
What is the minimum recommended space between the ends of racks to provide room for spotters?
A.1 foot
B. 2 feet
C. 3 feet
C. 3 feet
The ___ phase is the first step in building a new facility. It should consist of a Need analysis, feasible study, and master plan.
Predesign phase
___ is the step in which the designers and experts collaborate and determine the needs of the program
Needs analysis
The second part of the pre design phase. Should analyze strengths, weaknesses and opportunities. SWOT
Feasibility study
The general plan for all phases of the new facility
Master plan
Last step of the pre design phase is hiring an
Architect
The ___ phase of the second phase in the process of building a new facility
Design
The period of time from the beginning of construction to the end. The longest phase of the process
Construction phase
Consist of the final steps before the facility can open . Interior decor and hiring staff
Preoperation phase
During the pre operation phase it is vital to create a plan that will make opening the facility easy, for example cleaning and maintenance duties.
True
FOrm committee
FEasilibility study
Needs analysis
FIrst steps