Case Study Flashcards
What is the remedial solution for limestone decay caused by sulphur staining.
- Undertake a pre-cleaning survey to establish the condition of the stone.
- Decide on a method of cleaning inc. brushing, water based methods, chemical methods or even lasercleaning.
What are some common defects of Bath stone?
- Limestone decay is caused by sulphur dioxide trapping pollutants and impacting the natural flow of water. This can be worsened near roads.
What is the current Bath office market?
- ## 2-5k office is the sweet spot so no need to subdivide the space further.
What causes the asphalt terrace upstands to crack?
Lack of maintence and prolonged weathering. It is anticipdated that the asphalt covering is in excess of 30 years old.
What was the reason you chose an Intermediate Contract w/ CDP?
- Trad Procurement
- Tender documents complete
- ## Slightly more complex of a project than a MW with some lighting installations
Was the provisional sum for the terrace repairs, defined or undefined?
Undefined , as the extent of the works was unknown until further investigations were undertaken.
What were the works priced against?
A specification.
What documents are issued under the JCT Intermediate Contract
Certificates
Cert if non-completion
Certificate of Practical Completion
What section is the CDP Design Work in for Intermediate Contract?
2.32
Why did you chose a negotiated over a two stage?
- Quicker into contract.
- ## Client wanted cost certainaty prior to entering into a legal agreement
How long should code 4 lead flashing be?
typically no more than 1500mm, however for asphalt it is recommended not to exceed 1000mm lengths.
Why Code 4 over other codes of lead?
It is more durable than 3, and more malleable than 5-8.
What does the Code of lead refer to?
Its weight and thickness.
Do you need building regs approval to apply the polyurethane liquid applied covering?
This would not require building regs approval as it is not considered a roof it is a terrace/ gutter.
What is the guidance under Part M, you are referring to for the installation of the latex?
For accessible entrances , it is recommended that a threshold level does not exceed 15mm, and if above 5mm it is chamfered or rounded.
What is the working at height regulations hierarchy?
The hierarchy pyramid states;
- Avoid work at height
- Collective fall protection
- PPE Work restraint
- PPE Fall arrest
From most to least effective Fall protection
What are the eight controls for working at height?
- Avoid Working at height
- Ensure all those working at height are properly trained and supervised
- Select work equipment that prevents falls
- Ensure equipment is suitable, stable and strong
- Regularly check and maintain equipment
- provide necasssary PPE and proection from falling objects
- Ensure the working environment is safe
- Plan for emergencies and rescues