What are the entry criteria for AOP-22, Pressurizer Level Control Malfunctions?

A
  • EK-0761, “PRESSURIZER LEVEL HI-LO”
  • EK-0763, “PRESSURIZER LEVEL CH “A” LO-LO”
  • EK-0764, “PRESSURIZER LEVEL CH “B” LO-LO”
  • EK-0769, “PRESSURIZER HIGH LEVEL”
  • Loss of level control program output signal causing a deviation from the calculated level control setpoint
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the AOP-22, Pressurizer Level Malfunction, automatic actions?

A

High Level - actual or indicated

  • CV-2004 and CV-2005, Letdown Orifice Stop Valves, open
  • P-55B and P-55C, Charging pumps, stop
  • P-55A, Charging Pump, operates at minimum speed (33 gpm)
  • Pressurizer Backup Heaters energize (in Auto position only)

Low Level - actual or indicated

  • CV-2004 and CV-2005, Orifice Stop Valves, close
  • P-55B and P-55C, Charging pumps, start
  • P-55A, Charging pump operates at maximum speed (53 gpm)

Low Low Level - actual or indicated

  • If “A”, “B” or “A & B” Pressurizer heater control is selected then all Pressurizer heaters trip.
  • CV-2003, Letdown Orifice Stop Valve closes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the trip crieria of AOP-22, Pressurizer Level Malfunctions?

A

Pressurizer Level less than 30% - Trip the Reactor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the mitigating strategy and what are the main actions of AOP-22, Pressurizer Level Control Malfunctions?

A

MITIGATION STRATEGY

Respond to Pressurizer level control not operating correctly.
Operate Charging and Letdown as needed to maintain/restore Pressurizer level.

ACTIONS

  1. Check if Pressurizer level is greater than 30% and less than 62.8%.
  2. Verify Pressurizer level greater than or equal to 36%.
  3. Operate Pressurizer level control or manually control Charging and Letdown.
  4. Perform one of the following: (substeps alternate controller or place controller in Manual mode)
  5. Procedure exit.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does HS 1/LRC-0101 do?

A
  • Passes the normal and backup level signals from LIC-0101A or B to P-55A/B/C and orifices # 2 and # 3 starting and stopping pumps, opening and closing orifices as needed to control level.
  • The signal from HS 1/LRC-0101 also activates the high/low level alarm and energizes the backup heaters if in auto (Backup heaters are procedurally required to be in Manual ie, always on), all based on a deviation from the program level setpoint.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How does normal level control work?

A

Cascade mode of operations is the only mode that responds to the “normal” level control program.

Controller Output Signal Lowering - Normal Control

  • 72.4 % Min Speed P-55A
  • 69.3 % Close CV-2005
  • 56.5 % Close CV-2004
  • 50.0 % P-55A at required capacity CV-2003 is Open
  • 30.8 % Start P-55B
  • 27.6 % Max speed P-55A
  • 24.3 % Start P-55C

Controller Output Signal Rising - Normal Control

  • 37.3% Trip P-55C
  • 43.5% Trip P-55B
  • 50.0 % P-55A at required capacity CV-2003 is Open
  • 69.3% Open CV-2004
  • 72.4% P-55A at Max Speed
  • 88.5% Open CV-2005
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How does backup level control given a deviation from setpoint?

A

~ +6% deviation

  • Hi-Lo Level Alarm (EK-0761)

~ +5% deviation

  • Backup Heaters On (Already ON)
  • Open CV-2004 & CV-2005
  • Trip P-55B & P-55C

~ +4% deviation

  • Hi-Lo Level Alarm Off (EK-0761)

~ +2% deviation

  • Backup Heaters Off
  • Permit P-55B & P-55C Start
  • Permit CV-2004 & CV-2005 Closure

~ - 4% deviation

  • Hi-Lo Level Alarm Off (EK-0761)
  • Permit P-55B & P-55C Stop
  • Permit CV-2004 & CV-2005 Open

~ - 6% deviation

  • Hi-Lo Level Alarm On (EK-0761)
  • Start P-55B & P-55C
  • Close CV-2004 & CV-2005
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How do you control pressurizer level outside the band of the level controllers?

A

Must take manual control of pumps and valves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What technical specification applies to AOP-22, Pressurizer Level Control Malfunctions?

A

T.S. 3.4.9

Applicable in Modes 1, 2 & 3

The pressurizer water level limit does not apply in MODE 3 until after a bubble has been established in the pressurizer and the pressurizer water level has been lowered to within its normal operating band.

The pressurizer shall be OPERABLE with:

  1. Pressurizer water level < 62.8%;
  2. ≥ 375 kW of pressurizer heater capacity available from electrical bus 1D, and
  3. ≥ 375 kW of pressurizer heater capacity available from electrical bus 1E with the capability of being powered from an emergency power supply.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When do the pressurizer heaters trip off? When might they not?

A

Trip Off at 36%

D-Bus heater breaker will not automatically re-energize. E-Bus will.

Loss of Y-01, protective trip feature of heaters is lost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

EK-0735, CHARGING LO FLOW comes in on what?

A

25 gpm charging flow.

  • CHECK Pressurizer level for confirmation of low flow condition.
  • VERIFY Pressurizer Level Control System starts an available Charging Pump as applicable, and that alarm clears
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

EK-0761, PRESSURIZER LEVEL HI-LO comes in on what?

A

5.75% Deviation from Setpoint on either LIC-0101A or LIC-0101B, whichever is selected.

High Level Alarm:

  • CV-2004 and CV-2005, Letdown Orifice Stop Valves, open.
  • P-55B, ‘B’ Charging Pump, and P-55C, ‘C’ Charging Pump, stop.
  • P-55A, ‘A’ Charging Pump, operates at minimum speed (33 gpm).
  • Pressurizer Backup Heaters energize (in AUTO position only).

Low Level Alarm:

  • CV-2004 and CV-2005 close.
  • P-55B and P-55C start.
  • P-55A operates at maximum speed (53 gpm).

OPERATOR ACTION:

  • CHECK Charging and Letdown response correct.
  • IF Charging and Letdown response NOT correct, THEN REFER TO AOP-22 for applicable actions .
  • IF selected TAVE input is inaccurate, THEN:
  • REFER TO AOP-27 for Tave/Tref Controller failure actions.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly