AOP-17, Loss of 125v DC Panels Flashcards
1
Q
What buses does AOP-17, Loss of 125v DC Buses cover?
A
D-11A
D-11-1
D-11-2
D-21A
D-21-1
D-21-2
2
Q
What are the entry conditions of AOP-17, Loss of 125v DC Panels?
A
D-11A
- P-8A, Motor Driven Auxiliary Feedwater Pump, Bkr Indication
- Bus 1C Control Power Available indication
D-11-1
- P-8A, Motor Driven Auxiliary Feedwater Pump, Bkr Indication
- Bus 1C Control Power Available indication
D-11-2
- K-7A, Feedwater Pump P-1A Turbine Driver, Trip Power
- CV-0847, SW Supply to Containment, position indication
D-21A
- P-8C, Motor Driven Auxiliary Feedwater Pump, Bkr indication
- Bus 1D Control Power Available
D-21-1
- CV-0501, S/G E-50B MSIV, position indication
- Bus 1B Control Power Available indication
- Bus 1E Control Power Available indication
D-21-2
- K-7B, Feedwater Pump P-1B Turbine Driver, Trip Power indication
- CV-1359, Non-Critical SW Header Isol, position indication
- EK-0542, “ANNUNCIATOR DC FAILURE”
3
Q
What happens on the loss of D-10R?
A
Deenergizing Bus ED-10R results in the loss of EY-10, Preferred AC Bus No 1,
and the following actions will occur:
- P-8A/P-8B AFW control circuitry transfers to EY-30 power.
- Main Feedwater control for ‘A’ S/G transfers to EY-30 power.
- P-8B, Steam Driven Auxiliary Feedwater Pump, starts.
4
Q
What happens on the loss of D-20R?
A
Deenergizing Bus ED-20R results in the loss of EY-20, Preferred AC Bus No 2,
and the Main Feedwater control for ‘B’ S/G transferring to EY-40 power.
5
Q
What happens on the loss of D-11-1?
A
Deenergizing Panel ED11-1 results in P-8B, Steam Driven Auxiliary Feedwater
Pump, starting.
6
Q
A